My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:23 PM
Creation date
2/17/2011 11:55:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.4 Infield turf shall be kept weed free at all times. <br />12.4.1 Any grasses other than the original hybrid Bermuda installed in the <br />infield shall be eradicated immediately upon notice. The Contractor may <br />choose the method of eradication, however, may not damage the turf. <br />12.4.2 Any broadleaf weeds shall be eradicated immediately upon notice. The <br />Contractor may choose the method of eradication, however, may not <br />damage the turf. <br />12.5 Infield turf shall be kept free of disease and rodents at all times. <br />12.5.1 The Contractor shall be responsible for identifying and treating any <br />diseases or rodents immediately upon notice. <br />12.6 Infield turf annual renovation <br />12.6.1 Each year the infield turf shall be renovated: 1) verticut using the greens reel <br />mowers straight blade reels; 2) mowed to 1/4" high immediately following <br />verticutting; 3) overseeded with Stovers Seed Company Sahara Dunes at a rate <br />of 8 pounds of seed per 1,000 square feet; and, 4) top dressed immediately <br />following seeding by Materials using "Santa Ana Top Dress Mix." <br />13.0 General Contract Provisions <br />13.1 Contractor shall provide and is responsible for all equipment necessary to carry out the <br />work outlined in the contract. There will be no available storage for equipment. <br />Contractor will be responsible for bringing in and then removing all equipment <br />necessary to carry out the work outlined in the contract. <br />44 <br />19C-46
The URL can be used to link to this page
Your browser does not support the video tag.