My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
FULL PACKET_2011-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:01:55 PM
Creation date
2/17/2011 1:18:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/22/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br />New Paint • Reputable manufacturer. <br />• Highest quality available. <br />• Zero or low VOC paint, caulking and fillers. <br />WALLS, FLOORS AND CEILINGS <br />Minimum Standard <br />• Safe and structurally sound. <br />• All plaster, cloLmall and paneling shall be safe and intact. <br />Rehabilitation <br />e Walls, floors and ceilings that do not meet the minimum <br />standard shall be replaced. Practical, cost effective repairs <br />are acceptable as Jong as compliance with the minimum <br />standard will be achieved. <br />Replacement Floor <br />• If the project involves a gut rehab, the attic, walls and <br />Coverings <br />floor on raised foundations shall be insulated. <br />FLOOR COVERINGS <br />Minimum Standard <br />• Safe, sound and sanitary. <br />• Five or more years of practical utility. <br />Rehabilitation <br />• Floor coverings that do not meet the minimum standard <br />shall be replaced. Practical, cost effective repairs are <br />acceptable 'aslong as compliance with the minimum <br />standard will be achieved. <br />Replacement Floor <br />• Carpet & Pad (Reputable manufacturer, recycled <br />Coverings <br />materials). <br />• Resilient Flooring (Reputable manufacturer, 10 year wear <br />warranty). <br />• Ceramic Tile (Reputable manufacturer) <br />INTERIOR DOORS <br />Minimum Standard <br />• Safe, sound and in good working order. <br />• Five or more ears of practical utility. <br />Rehabilitation <br />• Interior doors that do not meet the minimum standard <br />shall be replaced. Practical, cost effective repairs are <br />acceptable as long as compliance with the minimum <br />standard will be achieved. <br />Replacement Doors & <br />• Doors (Reputable manufacturer, masonite, raised panel). <br />Hardware <br />• Hardware (Reputable manufacturer, lifetime finish). <br />INTERIOR PAINT <br />Minimum Standard • Homes built before 1978 must comply with 24 CFR Part <br />NSP3 Substantial Amendment Page 5 <br />City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.