My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - TRAFFIC SIGNAL SYS UPGRADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
23B - PROJ - TRAFFIC SIGNAL SYS UPGRADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:23 PM
Creation date
3/3/2011 10:03:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23B
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />MARCH 7, 2011 <br />TITLE: <br />CONTRACT AWARD WITH <br />CALIFORNIA PROFESSIONAL <br />ENGINEERING, INC. FOR TRAFFIC <br />SIGNAL SYSTEM UPGRADES - <br />PHASES 1, 2, 3, AND 4 <br />(PROJECT NOS. 106708, 106709, <br />106710, AND 106711) <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />? As Recommended <br />? As Amended <br />? Ordinance on 1st Reading <br />? Ordinance on 2"d Reading <br />? Implementing Resolution <br />? Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to California Professional Engineering, Inc., the lowest responsible bidder, <br />in accordance with unit bid prices for the base bid plus add-on alternates one, two, three, and <br />four in the estimated amount of $226,965 for construction of Traffic Signal System Upgrades- <br />Phases 1, 2, 3 and 4. <br />2. Approve a Funding Analysis with a total estimated construction cost of $306,400. <br />DISCUSSION <br />The current traffic signal system that controls most of the City's traffic signals is outdated and no <br />longer supported by the manufacturer. Several years ago, the City implemented a new traffic <br />signal management system and is in the process of transitioning into the new system by <br />replacing the existing signal controllers with ones that are compatible with the new system. The <br />City has replaced less than half of all signal controllers using Measure M funds. This <br />construction contract will replace an additional 28 traffic signal controllers and cabinets. <br />The Notice Inviting Bids was advertised on December 27 and 29, 2010, and bids were opened on <br />January 18, 2011. A summary of the bid invitations mailed, the bids received, and the bid results <br />follows. <br />Santa Ana Contractors receiving notices: 23 <br />Contractors requesting bidding documents: 9 <br />Bids received: 7 <br />Bids received from Santa Ana Contractors: 0 <br />23B-1
The URL can be used to link to this page
Your browser does not support the video tag.