My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25J - AGMT - TESTING AND INSPECTION SRVS FOR CIP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
25J - AGMT - TESTING AND INSPECTION SRVS FOR CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:38 PM
Creation date
3/3/2011 11:55:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25J
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Caltrans' Reference Samples Program (RSP) <br />Acceptance Testing and Sampling <br />? The selected testing laboratory shall conduct acceptance testing of materials on <br />the first day when work is performed, and continues daily until the work is <br />completed. <br />Reporting Test Results <br />? When aggregate sample is taken in the material source, the testing firm shall <br />submit to the Resident Engineer results of sand equivalent, cleanness value and <br />sieve analysis within 24 hours. When soils and aggregate samples are taken at <br />the job site, results of these tests should be submitted within 72 hours. <br />? Results of compaction and density tests taken at the job site should be submitted <br />within 24 hours. <br />? When samples of soils and asphalt concrete are taken at the job site, R-value <br />and result of asphalt extraction test should be submitted within 96 hours. <br />Independent Assurance Sampling and Testing <br />The selected firm shall establish and maintain an Independent Sampling and Testing <br />(ISAT) program: <br />? To verify that the project's sampling and testing is performed correctly by the <br />testers and samplers. <br />? To ensure the equipment is properly calibrated. <br />? To provide the City with a copy of the program to ensure that the program is <br />carried out. <br />? To provide the Resident Engineer with a report indicating actions to be taken by <br />the selected testing firm when discrepancies are found between ISAT and <br />acceptance tests (AT). <br />IV. CITY'S RESPONSIBILITIES <br />1. Furnish construction plans and specifications to the consultant. <br />2. Coordinate with the contractor regarding work schedule and notify the <br />consultant 24 hours in advance for the required inspections and tests. <br />2eJ-13
The URL can be used to link to this page
Your browser does not support the video tag.