Electrical Engr $ 9,600 <br />Structural Engr $ 7,000 <br />Cost Estimate $ 1.500 <br />Total Cost (this location): $ 43,475 <br />(maintenance hub and typical work) <br />(Design and CA) <br />AECOM Engineering/Mgmt cost for the design phase is based upon: <br />16 hours of coordination <br />16 hours to prepare bid documents (will be reduced if Fiesta is included since hrs overlap effort) <br />8 hours CA <br />3rd and Broadway Parking Structure <br />AECOM's scope of work generally includes: <br />Incorporation of security bars for first and second stories of structure; equip exterior doors with egress <br />only hardware and panic hardware; roll-up grilles at three locations within structure; install gates on two <br />locations to limit access across pedestrian bridges; upgrade all lighting within structure; add lighting to <br />exterior alcove on southeast portion of structure; and update electrical drawings by other for incorporation <br />into package. <br />Resolution of low point on top story which results in ponding on top floor, and installation of a new booth <br />and electric gates within the garage will be by others. That work is not included in this scope or work. <br />For architectural services detailed scope of work see Attachment A. <br />Electrical Enaineerina <br />Verify as-built drawings. <br />Upgrade existing lighting; where new fixtures are required, exposed conduit will be specified. <br />Power plans to include upgrade of gate controls, booths, and overhead roll-up gates. <br />Prepare electrical drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals <br />Structural Enalneerina <br />The total cost of the service is $63,775. This cost Is based on the following breakdown: <br />Engineering/Mgmt $ 8,100 <br />Engineering/Mgmt $ 2,760 <br />Architectural Engr $ 31,215 <br />Electrical Engr $ 12,500 <br />Structural Engr $ 7,700 <br />Cost Estimate $ 1.500 <br />Total Cost (this location): $ 63,775 <br />(Design Phase - coord, mgmt, bid document) <br />(CA) <br />(Design and CA) <br />(new lighting plus typical) <br />(Design and CA) <br />AECOM Engineering/Mgmt cost for the design phase is based upon: <br />20 hours of coordination <br />20 hours to prepare bid documents (will be reduced if Fiesta is Included since hrs overlap effort) <br />12 hours CA <br />AECOM <br />8OA-12