My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT - PARKING GARAGES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
80A - JOINT - PARKING GARAGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:45 PM
Creation date
3/3/2011 1:52:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Engineering <br />Note: it is our understanding that the lighting improvements within this structure will be undertaken by PCI <br />and we have therefore not included any hours for that task or item, AECOM will: <br />Verify as-built drawings. <br />Power plans to include the upgrade of gate arm controls and the installation of electrically operated <br />overhead roll-up doors. <br />Prepare electrical drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals. <br />Structural Engineering <br />Support of architectural security enhancements. <br />The total cost of the service is $57,950. This cost is based on the following breakdown: <br />Engineering/Mgmt $ 7,300 <br />Engineering/Mgmt $ 2,400 <br />Architectural Engr $ 32,350 <br />Electrical Engr $ 6,700 <br />Structural Engr $ 7,700 <br />Cost Estimate $ 1,500 <br />Total Cost (this location): $ 57,950 <br />(Design Phase - coord, mgmt, bid document) <br />(CA) <br />(Design and CA) <br />(parking controls electrical) <br />(Design and CA) <br />AECOM Engineering/Mgmt cost for the design phase is based upon: <br />20 hours of coordination <br />16 hours to prepare bid documents (will be reduced if Fiesta is Included since hrs overlap effort) <br />12 hours CA _ <br />5"' and Main Street Parking Structure <br />AECOM's scope of work generally includes: <br />Incorporation of security bars/grilles to second story of parking structure; replacement of concrete panel <br />on second story along Main Street side of structure; Incorporation of electrical equipment as needed to <br />accommodate management booth. <br />For architectural services detailed scope of work see Attachment A. <br />Electrical Engineering <br />Verify as-built drawings. <br />Power plans to include the upgrade of gate arm controls, booths, and installation of electrically operated <br />roll-up gates. <br />Prepare electrical drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals. <br />Structural Engineering <br />Support of architectural security measures. <br />The total cost of the service is $43,475. This cost is based on the following breakdown: <br />EngineeringiMgmt $ 3,250 (Design Phase - coord, mgmt, bid document) <br />Engineering/Mgmt $ 1,625 (CA) <br />Architectural Engr $ 20,500 (Design and CA) <br />\ia'C;i':,I ?fylliiLl('Qt ti!( li i AECOM <br />8OA-11
The URL can be used to link to this page
Your browser does not support the video tag.