My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT - PARKING GARAGES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
80A - JOINT - PARKING GARAGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:45 PM
Creation date
3/3/2011 1:52:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gregory Hefter <br />February 7, 2011- Page 2 <br />• SGA will prepare designs and documents for Fagade remodel / renovation / <br />modernization improvements that may 'include, but are not limited to, removal of and <br />replacement of existing graphics, removal and replacement of existing guardrail <br />planters and supports; new applied architectural detailing with new and <br />complementing designs, materials and colors. <br />• SGA will analyze and prepare designs and documents to address code required <br />improvements including, but not limited to, disabled access compliance for stairs & <br />railings, path of travel access & egress, upgrade of at least of the existing public <br />restrooms to a single uni-sex restroom for parking attendant and elevator access <br />verification. <br />• SGA will provide assistance and coordination to AECOM, The Oily and other <br />consultants for miscellaneous improvements that may include, but are not limited to, <br />new signage and graphics prepared by other, new parking control system prepared <br />by others, new interior lighting prepared by AECOM with fixtures as coordinated with <br />SGA, new Interior paint finishes including graffiti prevention and structural <br />improvements as may be required by AECOM. <br />SGA Basic Services will include Architectural Services Only. SGA's Basic Services will include <br />the preparation of architectural documents and coordination with AECOM and other design <br />professionals to competitively bid and build the desired improvements as indicated above. <br />SGA Basic Services do not include the following consultants, engineers or services; <br />geotechnical engineering, civil engineering, structural engineering modifications to existing <br />structure, mechanical engineering, electrical engineering, fire sprinkler/ life safety, landscape <br />design services, graphlc/signage design and vehicular access and pedestrian security design <br />services. <br />SGA Basic Services will include coordination with AECOM and other additional consultants the <br />City may select, including, but not limited to, Signage & Graphics and Parking Controls. <br />Basic services do not Include utility relocation or temporary facilities which may or may not be <br />required. <br />Basic Services and Responsibilities: <br />Programming / Master Planning: Provided under separate Agreement with the City of Santa <br />Ana. <br />SGA Design Development Services: <br />Design Development Documents <br />Prepare a package of drawings and other documents refining and explaining the <br />proposed program improvements. This package includes general site plan, floor <br />plans, elevations, sections and details as may be required. <br />Coordinate with AECOM for structural, mechanical and electrical improvements. <br />r Coordinate any required street improvements directly adjacent to the Project with the <br />appropriate City Department or consultant. <br />Coordinate any signage and graphic designs with the appropriate City Department or <br />consultant. <br />8OA-19
The URL can be used to link to this page
Your browser does not support the video tag.