My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT - PARKING GARAGES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
80A - JOINT - PARKING GARAGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:45 PM
Creation date
3/3/2011 1:52:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gregory Hefter <br />February 7, 2011- Page 3 <br />Coordinate any parking control designs with the appropriate City Department or <br />consultant. <br />Attend meetings with AECOM and the City as may be required and make <br />presentations as requested or required. <br />SGA Construction Document Services: <br />SGA Architectural Construction Documents: <br />Prepare construction documents consisting of drawings and specifications setting <br />forth the requirements for project construction, The final construction documents will <br />be of sufficient detail to reasonably bid and build the project by a competent general <br />contractor familiar with this type of work. <br />The architectural construction documents are prepared from the approved Design <br />Development drawings with two-dimensional graphic representations, such as plans, <br />elevations, sections, and details indicating the design, location, size, and dimensions <br />of the project and of the parts thereof. (dotes on the drawings and specifications <br />support and explain the graphic representations. <br />Coordinate with AECOM for structural, mechanical and electrical improvements. <br />Coordinate any required street Improvements directly adjacent to the Project with the <br />appropriate City Department or consultant. <br />Coordinate any signage and graphic designs with the appropriate City Department or <br />consultant. <br />Coordinate any parking control designs with the appropriate City Department or <br />consultant. <br />Attend meetings with AECOM and the City as may be required and make <br />presentations as requested or required. <br />Plan Check: <br />Submit the appropriate documents to the various govemmental departments for the <br />purpose of checking plans prior to Issuing building permits. <br />Coordinate with the various governmental agencies and make adjustments necessary <br />to the architectural construction documents and coordinate any requirements with <br />AECOM and other City consultants so that they will satisfy the requirements for <br />Issuance of a building permit. <br />SGA Construction Administration Services: <br />General <br />SGA will provide services during the course of construction on an as needed basis to <br />assist AECOM and the City in the bidding and selection of an overall Project <br />Construction Manager andlor General Contractor and will be available to provide the <br />s; services indicated below within the ailotted amount Indicated In the Compensation <br />section below. <br />8OA-20
The URL can be used to link to this page
Your browser does not support the video tag.