My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT - PARKING GARAGES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
80A - JOINT - PARKING GARAGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:45 PM
Creation date
3/3/2011 1:52:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br />AECOM <br />999'N. Town & Country Road, Orange. CA 92868 <br />T 714.567.2501 F 714.567.2441 mmaecom.com <br />February 10, 2011 <br />Mr. Jason Gabriel <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, California 92702 <br />Dear Jason, <br />Subject: Fiesta Marketplace Parking Stkt'ucture Final Design <br />This letter is AECOM's proposal for services associated with security upgrades at three City of Santa Ana <br />parking structures and architectural, structural, and security upgrades at the Fiesta Marketplace parking <br />structure. The basis of our scope of work is the assessment matrix prepared by the City and a field walk <br />on February 3, 2011. The field walk included with City staff, AECOM staff, and a PCI manager. <br />For services related to the Fiesta Marketplace, AECOM prepared a proposal in June, 2010 which <br />Included engineering and architectural services needed to prepare contract documents and construction <br />support for the improvements fisted in an assessment report dated May 21, 2010. It is my understanding <br />that those Improvements will be incorporated into this project and this proposal therefore Includes the <br />effort previously described plus some additional security enhancements. <br />Four parking structures are contained in this proposal and scope of work. They include: 3rd and Birch; 5'h <br />and Main; 5 and Sturgeon (Fiesta Marketplace garage); and, 3`4 and Broadway. <br />We have two subconsuftants on our team: Nestor+Gaffney and the Structural Group. Structural Group <br />will provide inspection and repair of the post-tensioning tendons in the Fiesta Marketplace parking <br />structure and Nestor+Gaffney will provide architectural services for the same garage. <br />General Scope of Work Items <br />The scope of work for this proposal Is to prepare contract documents for the improvements described <br />below. The proposal does not Include seismic analysis or retrofit of any structures, fire sprinklers, parking <br />lot ingress/egress controls, or modifications to the sidewalks or public streets around the parking <br />structures. <br />In addition, video surveillance camera systems are not Included In this proposal since the final decision of <br />whether to include them has not yet been made. <br />The contract documents will be to City of Santa Ana standards and will include plans, specifications, and <br />contract provisions. It Is assumed that the City's standard boilerplate contract document will be used as a <br />basis and updated with the project's information to form the final contract documents. This will be <br />performed by AECOM as part of this proposal. <br />The scope of work also Includes construction administration (CA). For this scope of work, CA is defined <br />as support to the City during the bid phase which includes answering bid questions. CA also includes <br />periodic field visits during construction (four visits), answering of requests for information (RFIs), and. <br />reviewing shop drawings as called for in the technical specifications. The City will advertise, collect bids, <br />analyze bids, and award construction contract; this work in not included with this proposal. This proposal <br />does not include administration of the construction contractor's contract, daily or frequent inspections, <br />tracking of changes during construction, or oversight of the contractor's work. <br /> <br />8OA-8
The URL can be used to link to this page
Your browser does not support the video tag.