My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT - PARKING GARAGES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
80A - JOINT - PARKING GARAGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:45 PM
Creation date
3/3/2011 1:52:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM will prepare a cost estimate for the improvements, and provide management and coordination <br />during the design. <br />Other assumptions include: <br />Submittal of the drawings will be made for the 50% milestone; 100% draft package; and final construction <br />documents. <br />Drawings will be in Autocad. <br />No geotechnical services are included <br />The hourly rates for 2011 are as listed In AECOM's On-Call contract (City contract number A-2008-216). <br />That rate sheet is attached for reference. <br />The detailed proposals from Nestor+Gaffney and Structural Group are attached which further specify the <br />scope of work and fee for each of their tasks. <br />Prolect Specifics - 5th and Sauraeon (Fiesta Marketplace) <br />Services will include those described in the Fiesta Marketplace Assessment Report dated May 21, 2010. <br />In general these items Include preparation of final construction documents which will include architectural <br />upgrades, structural repairs, lighting upgrades, ADA compliance, and post-tensioning tendon inspection <br />and repair within the parking structure. <br />In addition to Assessment Report, the scope of work includes: <br />Security fence around the perimeter of level 2 of the structure. <br />Panic hardware on all exterior doors, and screening around those doors to enhance security. <br />Design solutions for two overhead roll-up security doors at each vehicle entrance. <br />The scope of work for this parking structure includes the following: <br />Architectural Services <br />As listed in the proposal from Nestor+Gaffney which Is Included as Attachment B In this proposal. <br />Security fence around the perimeter of level 2 of the structure. <br />Panic hardware on all exterior doors, and screening around those doors to enhance security. <br />Design solutions for two overhead roll-up security doors at each vehicle entrance. <br />Structural Enaineerlna <br />Identify damaged and spalled concrete. <br />Identify location of exposed post-tensioned strands on floor plans. <br />Review and coordinate repair works for strands with subcontractor. <br />Provide design and detail as needed to attach new sign to the structure at north entrance. Slgnage will <br />be designed by the sign vendor (by others) who will supply the reaction loads at anchor points. <br />Provide design and detail of supports as needed for roll-up doors. <br />Provide detail to eliminate ponding at one column location on ground floor. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan check comments. <br />Prepare calculations, drawings, and book specification for all recommended works. <br />Provide CA during construction. <br />Electrical Encrineerina <br />Verify as-built drawings. <br />Power plans to Include the upgrade of gate controls and the installation of electrically operated overhead <br />roll-up doors. <br />Prepare electrical drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals. <br />Note: It is our understanding that the lighting improvements within this structure will be undertaken by PCI <br />and we have therefore not Included any hours for that task or item. <br />ilon <br />I A[COM <br />8OA-9
The URL can be used to link to this page
Your browser does not support the video tag.