My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MERCHANTS LANDSCAPE SERVICES, INC. 2D
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MERCHANTS LANDSCAPE SERVICES, INC. 2D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:57:12 PM
Creation date
3/10/2011 6:41:03 PM
Metadata
Fields
Template:
Contracts
Company Name
MERCHANTS LANDSCAPE SERVICES, INC.
Contract #
A-2011-043
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
2/22/2011
Expiration Date
7/31/2011
Insurance Exp Date
7/1/2012
Destruction Year
2015
Notes
Amends A-2009-053, A-2009-170, A-2009-193, A-2010-098
Document Relationships
MERCHANTS LANDSCAPE SERVICES 2
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2A
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2B
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2C
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />ANNUAL COLOR PLANTING AND MAINTENANCE SPECIFICATION <br />Annual Color Planting and Care <br />Before each annual planting the area should be tilled 8 to 16 inches deep. Organic matter in the form of nitrified <br />redwood must be incorporated to a dept of 8" of the topsoil. The contract administrator may adjust this if <br />adequate organic matter is already present in the soil but the successful bidder must be prepared to incorporate <br />this organic matter at every color rotation. Organic matter must comprise 25% of the soil volume where the roots <br />will be. This requires 2" of nitrified redwood tilled to an 8° depth. Apply 1.5 pounds of nitrogen per 1000 sq. ft. as <br />a complete low nitrogen material with a ratio of 1:2:1, 1:1:1,1:2:2 or similar. Do not use a higher rate of nitrogen <br />as this may result in excessive vegetative growth and a suppression of flowering. After establishment, fertilize as <br />necessary to maintain a robust appearance and maximum flowering. After incorporating organic material and <br />other supplements, the beds must be raked smooth and slightly mounded. Sticks clods and other material must <br />be removed from the bed. <br />During planting gently crush the root mass with the fingers to stimulate root growth in the surrounding soil. Begin <br />planting in the center of the bed and keep traffic in the worked soil to a minimum. Make the hole slightly larger <br />than the root ball and set the plant at the same depth or slightly higher than it was growing in the container. <br />Smooth out the soil around the plants after planting, including footprints. Water plants to a depth of 5 inches <br />immediately after planting for 4" plant material (deeper for larger pots). <br />Plants are to be rotated four times a year and are to be kept disease free and healthy on a consistent basis. <br />There must be no dead or missing plants at any time and the beds must be kept in a weed free condition. Plants <br />will be in 4' pots and will be planted in an 8° triangular spacing pattern. Rows must be in a straight alignment at <br />the time of planting. Plant species that may be planted at different times of the year may include but not be limited <br />to the following annual bedding plants: <br />• Spring/Summer — April through October 1 <br />Alyssum, Lobelia, Salvia, Marigold, Gloriosa daisy, Penstemon, Cosmos, Dahlia, Impatiens, Begonias, <br />Double Impatiens, Petunia, Verbena, Vinca rosea (periwinkle) Zinnias, Marigolds <br />Fall/Winter <br />Iceland poppies, Pansies, Viola, Stock, Snapdragons, Primroses, Renunculus <br />Vandalism <br />Contractor shall check annual color beds daily (Monday through Friday). If plants are missing or <br />vandalized, the Contractor shall provide the City's representative with a proposal to replace <br />missing/damaged plants. After the City's Representative signs the proposal, the Contractor shall then <br />replanUreplace missingidamaged plants within 48 hours. <br />The City's contract administrator shall be the sole judge of whether the above specifications are met. The <br />contract administrator shall also approve the types and combinations of color bedding plants prior to <br />installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.