My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - CONSTRUCTION MGMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
25E - AGMT - CONSTRUCTION MGMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:41 PM
Creation date
3/17/2011 1:18:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working Days to the contractor. Check certified payrolls. Monitor contractor's <br />compliance with labor code requirements. <br />13. Maintain (at the job site) records of contract documents including drawings, addenda, <br />change orders, and other modifications of plans and specifications marked to show all <br />changes made during construction. Maintain as-built records of underground utilities, <br />including locations and depths of trenches. At the completion of the project, deliver to <br />the City all contract documents including as-built records. <br />14. Evaluate the completion of the work of the contractor and make recommendations to <br />the City when work is ready for final inspection. Assist the City in conducting final <br />inspections. Secure and transmit to the City required guarantees, affidavits, leases, <br />operations manuals and other documents stipulated to be submitted by the contractor. <br />15. Provide computer, telephone services, and copy and fax machines at the site. These <br />equipments are the property of the consultant. <br />Ill. CITY`S RESPONSIBILITIES <br />1. Provide a testing laboratory for material tests and special inspections on reinforced <br />concrete, structural steel, and grading and other quality control advisees as required by <br />the contract documents. <br />2. Process progress payments upon receipt of approved payment requests from the <br />resident engineer. <br />3. Furnish copies of construction documents, including plans and specifications. <br />4. Retain the engineer to review shop drawings and submittals, to respond to requests for <br />information and to revise plans if needed. <br />5. Provide a field office for the consultant's field personnel. <br />IV. ISSUING OFFICE <br />Raul Godinez II, Executive Director, Public Works Agency - M-22; 20 Civic Center Plaza - <br />Ross Street Annex, Fourth Floor, Santa Ana, California 92702. <br />V. SCHEDULE <br />Proposals are due in the Public Works Agency Executive Director's Office, before 5:00 p.m. <br />on December 17, 2010, to the attention of the Executive Director of Public Works Agency. <br />6 <br />25E-27
The URL can be used to link to this page
Your browser does not support the video tag.