My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - CONSTRUCTION MGMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
25E - AGMT - CONSTRUCTION MGMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:41 PM
Creation date
3/17/2011 1:18:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of the Project <br />Technical Understanding <br />The First Street Bridge Replacement Project over <br />the Santa Ana River will include the removal and <br />replacement of the two existing structures (north and <br />south structures). It is crucial to maintain one through- <br />lane in each direction during the construction of the First <br />Street Bridge, The project is to be completed in three <br />stages, including the demolition of the north structure. <br />The construction management team forthis work shall <br />provide a resident engineer/construction manager <br />and all support staff, which shall include office <br />management and labor compliance, project control <br />and scheduling analysis, structures inspection, water <br />line relocation inspection, and roadway construction <br />inspection, including irrigation and planting. <br />Stage T Construction <br />Stage 1 construction shall include the following <br />construction activities: <br />• Redirect all traffic onto the existing south <br />structure, one lane in each direction <br />• Remove existing signs and post at First Street <br />• Remove existing conflicting striping <br />• Install temporary K-rail per Caltrans standards <br />• Install new signs per plan <br />• Install temporary striping per plan <br />• Start street improvements on the north side <br />• Demolish the existing north structure, <br />including superstructure and substructure. <br />Existing piles shall be cut off one foot below <br />the channel invert. <br />• Construct the new structure (foundation <br />work shall take place during the dry season, <br />April 30 to October 1) <br />• Construct the retaining wall at the <br />northeast quadrant <br />11111LL City of Santa Ana I Public Works Agency <br />First Street Bridge Replacement I Construction Management <br />1 <br /> <br /> <br /> TYPICALSECTION <br />- <br />- rpsrsnfctT <br />ffTA7M•10M YO aTA llTnf {t01 <br />?t <br /> <br />- !TA )H.)fft TOITAYtftfAiQtaF _ <br />_- <br />First Street Typical Section Diagram <br /> <br /> <br /> <br /> <br />f STAGE 1 BRIDGE CONSTRUCTiON <br />First Street Stage 2 Bridge Construction Cross Section <br />Page 14 <br />25E-39 <br />First Street Elevation
The URL can be used to link to this page
Your browser does not support the video tag.