My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - CONSTRUCTION MGMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
25E - AGMT - CONSTRUCTION MGMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:41 PM
Creation date
3/17/2011 1:18:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Contingency Services <br />Proposed Personnel by Proposed Proposed <br />Classification/Responsibility Hourly Rate Hours Total <br />CM/RE <br />Construction Manager/Resident Engineer $ 170.00 600 $ 102,000.00 <br />Inspections <br />Construction Inspector $ 130.00 600 $ 78,000.00 <br />Ill. Grand Total <br />Grand Total of I, and II. above = $ 467,500.00 <br />Notes: <br />1. Construction duration is estimated at 24 months. <br />2. Inspectors will be fully equipped with vehicles, computers, tools, and equipment required to <br />perform their tasks (included in our hourly rate). <br />3. Overtime rates are calulated at 1.5 times the hourly rate for construction Inspectors. All <br />overtime shall be pre-approved by the City. <br />4. Client to provide field office and field office equipment. <br />1"ftt City of Santa Ana I Public Works Agency Page 12 <br />First Street Bridge Replacement I Construction Management <br />25E-46
The URL can be used to link to this page
Your browser does not support the video tag.