Laserfiche WebLink
EXHIBIT "C" <br />Cost Proposal <br />1. Itemized Estimated Breakdown for CM Services <br />A. Personnel by Classiflcatlon/Responsibility <br />The following cost proposal assumes that the Contractor will have idle time due to rainy seasons. <br /> Estimated Hours <br />Personnel Hourly Rate by Category <br />CM/RE <br />Construction Manager/Resident Engineer $ 170.00 1,248 <br /> Subtotal $ 212,160.00 <br />Inspections <br />Construction inspector $ 130,00 3,120 <br /> Subtotal $ 405,600.00 <br /> Category Subtotal $ 617,760.00 <br />Office Engineering/Project Controls <br />Diaz Consultants - DBE subconsultant <br />Office Engineer/Project Controls/Office Assistance As Required <br /> Subtotal $ 52,479.00 <br />WRC Consulting LIDBE subconsultant <br />Office Engineer/Project Controls/office Assistance $ As Required <br /> Subtotal $ 64,459.00 <br /> Category Subtotal $ 116,938.00 <br />TOTAL ESTIMATED PERSONNEL COST $ 734,698.00 <br />B. Additional Resident Engineer and Inspection Services It No Idle Time Is Utilized <br />by the Contractor and Subject to City Approval. <br />Reimbursables Quantity Cost <br />Construction Manager/Resident Engineer As <br />Needed $170.00 / hour <br />Construction Inspector As <br />Needed $130.00 / hour <br />Category Subtotal $52,802.00 <br />Subtotal of A and 8 = $ 787,500.00 <br />City of Santa Ana I Public Works Agency Page (1 <br />First Street Bridge Replacement I Construction Management <br />25E-45