My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - BIKEWAYS STRATEGIC PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
55A - BIKEWAYS STRATEGIC PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:45 PM
Creation date
3/17/2011 1:18:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55A
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Add Class 11 bikeway on Flower Street from Memory Lane to Fisher Park to Map 1.1 and <br />Exhibit: Orange County Bikeway Map / Section 3 and Section 4 in Appendix 4. <br />4. Add Class I bikeway on Bear Street from Segerstrom to MacArthur Blvd. to Map 1.1, <br />Map 1.2 and Exhibit: Orange County Bikeway Map / Section 3 and Section 4 in <br />Appendix 4. <br />5. Identify Raitt Street between McFadden Avenue and Edinger Avenue as a Proposed <br />Class I Bikeway in Map 1.1 and Exhibit: Orange County Bikeway Map / Section 3 in <br />Appendix 4. <br />6. Identify the Water Channel E/O Raitt Street between Occidental Street and Alton as a <br />Proposed Class I bikeway in Map 1.1 and Exhibit: Orange County Bikeway Map / Section <br />3 in Appendix 4. <br />7. Add the Alton/Maple Union Pacific Class I bikeway to Map1.1, Map 1.2, Exhibit Orange <br />County Bikeway Map / Section 3 and Section 4 in Appendix 4. <br />8. Add a Proposed Class 11 bikeway on Memory Ln between Bristol Street and Santa Ana <br />River to Exhibit: Orange County Bikeway Map / Section 4. <br />9. Identify Bristol Street as a Proposed Class 11 bikeway in Map1.1. <br />10. Identify Grand Avenue as a proposed Class lI bikeway in Mapl.1. <br />11. Past Expenditures for bicycle facilities include: <br />• Flower Street Bike Trail Extension. The project consisted of the installation of a <br />10' wide bike trail, landscaping and supporting irrigation along a''/z mile length of <br />a flood channel which runs parallel along Flower Street. The project total cost was <br />$1,112,000. <br />• Santiago Creek Underpass. The project consisted of the installation of a bike trail <br />underpass to the 22-fwy and Main Street. The project total cost was $500,000. <br />• Carl Thornton Park Re-pavement. The project rehabilitated the bike trail going <br />through Carl Thornton Park. Project cost was about $100,000. <br />12. The City has no funding mechanism for improving or implementation new bicycle <br />facilities. The City relies on obtaining grant funding and providing matching fund to <br />leverage the limited available City funds. Overall, the City has a need for new bike <br />facilities in the corresponding financial need. <br />13. The following are "typographical" errors should be corrected on the specified pages <br />• Appendix Pagel 70: "Bristol" St./ La Veta Ave. <br />• Appendix Page 171: <br />17t' St Garden Grove City Limit "East" City Limit <br /> "(Buena St.)" (Deodar St.) <br />Sunflower Ave. <br />Costa Mesa City Limit <br />Costa Mesa City Limit <br /> "(Bear St.)" "(E Park Center)" <br />Page 169: <br />Metro link/Amtrak Santa Ana Station Bicycle racks <br />(18)/Lockers"(15)" <br />4 <br />55A-9
The URL can be used to link to this page
Your browser does not support the video tag.