My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - Bikeway Master Plan_Exhibit A - Complete Addendum Final
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
55A - Bikeway Master Plan_Exhibit A - Complete Addendum Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:44 PM
Creation date
3/22/2011 10:05:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55A
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> ADDENDUM TO OCTA <br /> <br /> COMMUTER BIKEWAYS STRATEGIC PLAN <br /> <br /> <br /> <br /> Introduction <br /> <br /> In order to be eligible for Bicycle Transportation Account funding, the City of Santa Ana is <br /> required to have an adopted bicycle transportation plan that meets with the criteria of the <br /> California Bicycle Transportation Act (Sections 890-894.2 of the California Streets and <br /> Highways Code). There is an option for the City to either prepare its own plan or to adopt a <br /> countywide plan. <br /> <br /> A countywide plan does exist in the OCTA Commuter Bikeways Strategic Plan (CBSP) adopted <br /> by the Orange County Transportation Authority (OCTA) Board of Directors on May of 2009. <br /> The 2009 CBSP, an update to the plan previously adopted by OCTA in 2001, represents the <br /> culmination of a regionally supported effort that took a little over a year to complete. The result <br /> is a comprehensive plan that was coordinated with city and county bike plans, general plans, land <br /> <br /> use maps and existing and proposed bicycle systems. Public input was also sought through <br /> surveys, public meetings, and by posting the draft document on the OCTA website. <br /> <br /> The information submitted by the City of Santa Ana to OCTA for inclusion in the countywide <br /> plan was intended to replicate the Bikeway Master Plan adopted by City Council in 1998. <br /> However, after several iterations, the final CBSP document was found to include some minor <br /> discrepancies. On November 2, 2009 the City adopted the CBSP as its bicycle plan. However, on <br /> March 21, 2011 the City of Santa Ana adopted minor amendments to the City's Bikeway Master <br /> Plan. Due to the March 21, 2011 Bikeway Master Plan amendments, the City is now required to <br /> re-adopt the CBSP as its bicycle plan in accordance with the California Streets and Highways <br /> <br /> Code. This addendum is being prepared to identify the areas where it differs from the Council- <br /> approvedplan. The CBSP, this addendum, its maps and exhibits will together embody the City <br /> of Santa Ana Bikeways Strategic Plan. <br /> <br /> Addendum <br /> <br /> The city of Santa Ana accepts the findings and proposed plans identified in the 2009 OCTA <br /> Commuter Bikeways Strategic Plan with the following exceptions: <br /> <br /> 1. Remove Class II bikeway on Flood Control Channel (Segerstrom Avenue to its south <br /> edge) to Map 1.1, Map 1.2 and Exhibit: Orange County Bikeway Map /Section 3 and <br /> <br /> Section 4 in Appendix 4. <br /> 2. Add Class II bikeway on Memory Lane from Santa Ana River to Flower Street to Map <br /> 1.1 and Exhibit: Orange County Bikeway Map /Section 3 and Section 4 in Appendix 4. <br /> <br /> <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.