My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM ., <br />Paul Walters <br />To: Interim City Manage '/ Date: August 1, 2911 <br />Raul Godinez II, Executive Director <br />b'rom; Public Works Agency <br />REQUEST FOR APPROVAL OF CHANGE ORDER N0.1; <br />Subject: PROJECT N0.06.1723' FEDERAL PROJECT 68RL5•5063 (989) <br />Contractor: Powell Conshucfors <br />8555BarlanaAvenue <br />Fontana, CA 92335 <br />Project Description: First Street Bridge Replacement over the Santa Ana River <br />Change Order Number: 1 Amount: $468,882 <br />Account Unit 03217660 Ar�ount 66220 AdMty: 06172302028 <br />Original Confrad Cost. $6,010,329 <br />Wo of Original <br />Amcunt of The <br />ChangeOrtler $4fi8,882 1.6% <br />Previously Approved •D• .a <br />Change Orders: <br />TofalChangeOrdem: $468,882 7.8% <br />REASON FOR CHANGE <br />A. high voltage power line, about 60 feet above the riverbed along the nodh side of the <br />bridge, would have been interfered with the foundation pile driving opera8ons which need a <br />safety clearance of a least 90 feet for the driving machine to drive the 70 feet long <br />reinforced concrete piles To take advantage of the dry season and not to delay the project <br />Wnile waiting for the Edison Company to relocate the power line, the design engineer has <br />revised the plan to change the concrete piles to steel I•beam piles that were driven In <br />shorfersedions and then ezlended bywelding. <br />This change order providea for deleting bid hems for fumiahing reinforced rAnaete piles, <br />providing and weld'mg steel piles and compensation to the coacrele pile subcontractor to <br />demolish and dispose 20 concete piles that have been fabdration already. <br />
The URL can be used to link to this page
Your browser does not support the video tag.