My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MI -1(40 <br />RFAChange Order No, 1 <br />August 1, 2011 <br />Paget <br />In order to operate the driving machine adjacent to the high voltage power line, the line has <br />been tleā¢energaetl during working hours every day by Edison. To expedite payment fo <br />Etlison for tle-energizing the line, the contractor was requested to make payment to Etlison <br />on behalf of the City. Therefore, this change order also provides compensation to the <br />contractor for payment made to Edison Prior approval for this change order was granted <br />on May 11 W4 <br />TOTALCOST = MIN 1 <br />B. The contractor installed traffic sUiping, signs and barricades according to the conUact <br />documents. Staff had monitored the traffic bow in the project vicinity and found that Uaifc <br />contol setup needed to be revised to prouftle safer mouements for the motorist through the <br />construction zone. This change order provides for the changes according to the revised <br />Uaifc control plans. Prior approval for this change order was granted on May 24, 2011. <br />AGREED PRICE =$1,669 <br />C, Field condifion reveals that an e>9sting irrigaton controller cabinet that controls the <br />irrigation line abng the west embankment of the river was in conflict with abuMenf number <br />one of the new bridge. This change order provides for relocation of the controler and <br />cabinet including new footing and insfallaflon of conduits and wiring. Prior approval for Phis <br />change order was granted on July 13, 2011. <br />AGREED PRICE _ $10,232 <br />Ua <br />Raul Godi ez, II <br />Ezecupve Director <br />Pu611cWorksAgency <br />cor <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />FranpscoGudenez F <br />Ezecutive Director <br />Finance and Management SeNices Agency <br />
The URL can be used to link to this page
Your browser does not support the video tag.