My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />,I CONTPACTCHANGEORDER <br />PmKINAF PROJECT NO. 06-1723; FIRST STREET BRIDGE Chaop8O*Numher 1 <br />REPACEMENT OVER THE SANTA ANA RIVER; <br />FEDERAL PROJECT #BRLS•5063 (089) <br />to Powell Constructors Com�allo� <br />DELETE THE FOLLOWING CONTRACT BID ITEMS AS FOLLOWS: <br />Item Bid Unit <br />No. Item Unit Quantity Price <br />44 Furnish piling (class 90) lF 868 $25 <br />46 Furnish pg (class 140) LF 8,168 $25 <br />EXTRAWORKATAGREED PRICE <br />A. Furnish and dove 10,235 linear feel of steel I • beams to constmct 136 foundation piles per <br />PCO #1. The agreed price includes; <br />➢ Full compensation for procurement, (rucking and delivery. <br />➢ Fullcompensationforcuffing, splicingandweldingshorlersectionsasneeded. <br />➢ Full compensation (or cutoff and disposal of all piling sections, inslallaticn of pile anchor <br />hors and submission of WQCP. <br />➢ Full compensation to drive all piles necessary to meet design demands as indicated on the <br />drawings and install each pile to avoid the Edison Company's overhead power lines. <br />➢ Compensation of $13,390 to demolish and dispose of twenty (20) conaete piles already <br />fabocaGon. <br />➢ Compensation of $82,500 paid by the contractor to Edison Company to de•energite <br />overhead lines during piles driving, as needed. <br />B. Revise traffic control setup per PCO #2. <br />AGREED PRICE =$676,881 <br />AGREED PRICE =$1,669 <br />C. RelocateimigalioncontrollercahinetperPCO #6. <br />AGREED PRICE = $10,232 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.