My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paul Wakere <br />To: Interim City Manager Die; Nouember30,2011 <br />Raul Godine:ll, EzeaNve Director <br />From; Public Works Agency <br />REQUEST FOR APPROVAL OF CHANGE ORDER NO, 3; <br />Subjau PROJECT N0.081723; FEDERAL PROJECT #BRbS•6063 (089) <br />Cordractor. PowellConsfmctors <br />8555 BananaAvanue <br />Fontana, CA 92335 <br />Project Oescnption: First Sheet Bridge Replacement over the Santa Ana River <br />Change Oder Number: 3 Amount: $120,165 <br />Aaaml Una 03217880 Aorount: 88220 A�urfy 08172302026 <br />OriginalCanUactCost: $8,010,329 <br />%of Original <br />Amount of The <br />Chanpe0rder: $120,185 2.0°k <br />PrevicuslyApprovad 628,568 10.4 <br />Change Orders, <br />ToWChange0rders: $746,153 12.4% <br />REASON FOR CHANGE <br />A. The conhactor is required to deaign and build a Mechanically Stabilized Embankment <br />jMSE) wall on the noMaast quadrant of tha bridge by d�oosing one type of wall from a Ilst <br />of wall systems shown 'm the conhacl documents. While designing fhe wall, k became <br />apparent tha(the loads from two Edison Company's poles panehagng the wall footing <br />were not considered In fhe original deaign specified in fhe conhacl documents. In addition, <br />the Edison Company was required to relocate dreir power pales and overhead line on the <br />nodh side of tl�e bridge to dear the new bridge. This change order provides [or reinforang <br />tl�e wall by installing steel angles and eddi8oral chap to accommodate tl�e addlfional <br />loads from Edison's poles and compensation to die conhador far working on a weekend <br />to grade the areas of new pale IoceGons before die Edisoha poles could be relocated. <br />Priarapproval Mrlhis change orderwas granted on Sepfember29, 2011. <br />AGREED PRICE =$23,800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.