My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ProjedO &1723 <br />RFAChange Oder No. 3 <br />Novembar30, 2011 <br />Paget <br />To aaommoda(e Level 3 Communicetlon Compan}�s conduits that will be hung from the <br />bridge deck, two utility openings were created of each end of the bridge structure to allow <br />the conduits to go through the bridge. This change order provides compensation to the <br />conUactorforadtlitional fortningand rehar <br />RGREED PRICE =$7,952 <br />C. While demolishing the north side of the badge, two enclosed spaces vnih doors were <br />found behind stem walls above the east and wed abutments After removing the stem <br />walls, field condition revealed that piles of hash were found. This change order provides <br />for handling and disposing the trash. Pea approval for This change order was granted on <br />June 15, 2011. <br />TOTALCOST =$8,705 <br />D. The contractor installed traffic sUiping, <br />documents. Staff had monitored <br />signs and barricades according to the conhact <br />the traffic flaw in the project vidnity and atldNanal <br />delineators and crash cushions ware placed for the mofoad safety and add�onal <br />directional signs were installed on the bike trail far the cyclists' safely. This change order <br />provides for placing addNanal delineators, crash cushions and directional signs. <br />TOTALCOST =$10,847 <br />E. Field condition reveals that an epsfmg &inch redaim¢d inigaflon line on the west <br />embankment of tl�e aver eras in conflict with abutment number one of the new badge and <br />an imgation conduit would be damaged duang the demolition of the badge. This change <br />order provides for relocation of hre imgatian line and protection for the condutl by <br />temporary plating a wrood enclosure around d, <br />TOTAL COST =$13,282 <br />E>asting Edison Companys high vdtage and disfa6ution power lines and communication <br />lines along the nodh side of the bridge have slaved down the pile driving opereflon. In <br />addlflon, the duragon of dewateang of ground wafer for the opereflon was estendetl. This <br />change order provides compensation to the contractor far additional labor and equipment <br />during piles driving operation and dewateang. <br />TOTALCOST =$55,599 <br />r <br />Raul Godir�z II ' <br />Ex¢cutive Direcdar <br />PuNicWo�SAgertiy <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />FranclscoGudemez �� <br />Executive Director <br />Finance and Management SerNces Rgency <br />
The URL can be used to link to this page
Your browser does not support the video tag.