My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Pm(sr(Numbsr PROJECT W. DB•1723; FIRST STREET BRIDGE ChargaOrdeNur* 3 <br />REPACEMENT OVERTHE SANTAANA RIVER; <br />FEDERAL PROJECT #BRLS•5083(089) <br />To PowellConshuLfors DooVar(a <br />EXTRA WORKAT AGREED PRICE <br />A. ReAesign and revise MSE wall #2 to acoommodate load from Edison Compan�s poles per <br />PCOs #12 & 15. <br />AGREED PRICE =$23,800 <br />B. Provide opening in the bridge to accommodate conduits; from Level 3 Communication Company <br />per PCO #9. <br />AGREED PRICE =$7,952 <br />EXTRA WORKAT TIME AND MATERIALS <br />C. Remove, handle and dispose trash found behind stem walls above the east and west e»sting abutments <br />per PCO #4. <br />TOTAL COST = $8,705 <br />D. Install additional delineators on hie xrest aide of the bodge, replace aesh wshions on tl�e east aide of <br />the bridge and install addNional kmporary dgns on Ne bike hails. In addNan, install temporsry power <br />pole for cammunkat'an overhead Imes per PCO #4A. <br />TOTAL COST = $10,841 <br />E. Relocate existing 5 redaimed imgation line on the west side of the bridge and prded existing <br />irrigation conduitfor conshuction phases 1 and 2 per PCO #7. <br />TOTAL COST = $13,282 <br />F. Compensation for eddtiional labor and equipment far piles driving operation and dewatedng <br />required while vrorking around �e Edison Company's overhead lines per PCO #8. <br />TOTAL COST = $55,599 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.