Laserfiche WebLink
_ CITY OF SANTA ANA <br />�� ''`'� �' PUBLIC WORKS AGENCY <br />�� I CONTRACT CHANGE ORDER <br />Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number g <br />REPLACEMENT OVER THE SANTA ANA RIVER; <br />FEDERAL PROJECT #BRCS -5063 (089) <br />To Powell Constructors, Inc_ contractor <br />EXTRA WORK AT AGREED PRICE <br />1. Compensate to mobilize in the channel after September 30, 201 1(PCO 14). <br />AGREED PRICE _ $2,158 <br />2. Provide and install couplers at the closure pour as directed per City of Santa Ana letter dated June <br />1 1 , 2012 (PCO 20). <br />AGREED PRICE _ $77,700 <br />3. Revise stage 2 construction traffic control as directed per City of Santa Ana letter dated February 22, <br />2012 (PCO 23). <br />AGREED PRICE _ $19,601 <br />4. Revise the planter located at the northeast side of the bridge as directed per City of Santa Ana letter <br />dated January 10, 2012 (PCO 24). <br />AGREED PRICE _ $49,476 <br />5. Modify the curb located at the mobile home park located at the northeast corner of the bridge as <br />directed per City of Santa Ana (PCO 25). <br />AGREED PRICE _ $1,942 <br />6. Modify the existing water line located east of the bridge as directed per City of Santa Ana (PCO 26). <br />AGREED PRICE _ $1,156 <br />7. Revise stage 2 construction traffic control as directed per City of Santa Ana (PCO 27). <br />AGREED PRICE _ $24,157 <br />8. Revise the irrigation at the planter located at the northeast side of the bridge as directed per City of <br />Santa Ana letter dated December 9, 2011 and January 5, 2012 (PCO 29). <br />AGREED PRICE _ $1 ,357 <br />9. Modify the abutment drainage and the bollards as directed per City of Santa Ana letter dated March <br />5, 2012 (PCO 30). <br />AGREED PRICE _ $1,913 <br />Page 1 of 2 <br />