Laserfiche WebLink
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 7 <br />REPLACEMENT OVER THE SANTA ANA RIVER; <br />FEDERAL PROJECT #BRLS -5063 (089) <br />To Powell Constructors. Inc. <br />Contractor <br />10. Saw cut and remove a section of the sound wall located at the northeast corner of the bridge as <br />directed per City of Santa Ana (PCO 37). <br />AGREED PRICE = $2,406 <br />11. Provide and install 148 linear feet of CMU wall at the southwest corner of the bridge as directed per <br />City of Santa Ana (PCO 38). <br />AGREED PRICE = $25,887 <br />12. Extend the existing fences along the new MSE wall located at the southwest corner of the bridge as <br />directed per City of Santa Ana (PCO 38). <br />AGREED PRICE = $12,401 <br />13. Realign the 298 If of new curb and gutter located at the southwest corner of the bridge as directed <br />per City of Santa Ana (PCO 39). <br />AGREED PRICE = $2,644 <br />14. Install two new bus pads located at the southwest and northwest corners of Susan and 1St Street as <br />directed per City of Santa Ana (PCO 39). <br />Page 2 of 3 <br />AGREED PRICE = $38,685 <br />