Laserfiche WebLink
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number PROJECT NO. 06 -1723; FIRST STREET BRIDGE Change Order Number 7 <br />REPLACEMENT OVER THE SANTA ANA RIVER; <br />FEDERAL PROJECT #BRLS -5063 (089) <br />To Powell Constructors. Inc. Contractor <br />EXTRA WORK AT AGREED PRICE <br />1. Delete the artificial turf and provide and install new irrigation and landscape as directed per City of <br />Santa Ana letter dated October 9, 2012 (PCO 33). <br />AGREED PRICE = $4,180 <br />2. Provide and install a bronze plaque as directed per City of Santa Ana letter dated September 12, <br />2012 (PCO 34). <br />AGREED PRICE = $2,550 <br />3. Increase the PCC channel liner removal and replacement and increase the size of the aggregate as <br />directed per City of Santa Ana (PCO 35). <br />AGREED PRICE = $9,720 <br />4. Remove the weeds, grade, and sod the adjacent property located at the northeast corner of the <br />bridge as directed per City of Santa Ana (PCO 36). <br />AGREED PRICE = $961 <br />5. Grade and pave the existing drive approach located at the northeast corner of the bridge as directed <br />per City of Santa Ana (PCO 36). <br />AGREED PRICE = $992 <br />6. Excavate the existing 60" water line located along the west bank of the bridge as directed per City of <br />Santa Ana (PCO 36). <br />AGREED PRICE = $789 <br />7. Remove and dispose of sand and debris from the lined channel as directed per City of Santa Ana <br />(PCO 36). <br />8. Remove the graffiti as directed per City of Santa Ana (PCO 36). <br />AGREED PRICE = $1,211 <br />AGREED PRICE = $2,750 <br />9. Repair the existing wrought iron fence located at the northeast corner of the bridge as directed per <br />City of Santa Ana (PCO 37). <br />AGREED PRICE = $2,527 <br />Page 1 of 3 <br />