Laserfiche WebLink
MORANDUM <br />To <br />From: <br />David Cavazos <br />City Manager <br />William Galvez, Interim Executive Director <br />Public Works Agency <br />Date: June 26, 2014 <br />Project No. 06 -1723; First Street Bridge Replacement over the Santa Ana River; <br />Federal Project #BRLS -5063 (089) <br />Sul ject: Change Order No. 9 <br />Contractor: Powell Constructors <br />8555 Banana Avenue <br />Fontana, CA 92335 <br />Project Description: First Street Bridge Replacement over the Santa Ana River <br />Change Order Number: 9 Change Order Amount: $12,311.00 <br />Accounting Unit - Account - Activity Number: 05917660 -6620 06172302028 <br />JUSTIFICATION <br />While laying out the new planter located at the southwest corner of the bridge it was <br />determined that the design did not have sufficient reinforcement for the loads. Therefore <br />the reinforcement was modified for the existing conditions. Additionally while installing the <br />new streetlight it was determined that embedment depth for the streetlights needed to be <br />increased to accommodate code requirements. (PCO 44) <br />AGREED PRICE _ $5,729 <br />2. After completing the improvements in front of the mobile home park located at the <br />northwest corner of the bridge, the owners of the property informed the City that there may <br />be a conflict with the bike traffic and the motor vehicles exiting their property. The City <br />Traffic Engineering Section reviewed the situation and requested additional striping and <br />signage at that location. (PCO 45) <br />AGREED PRICE _ $6,213 <br />3. While performing a preliminary final job inspection it was determined that several areas <br />required additional landscaping to complete the intent of the design. (PCO 46). <br />AGREED PRICE _ $369 <br />