My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 12:03:57 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Expiration Date
7/24/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORANDUM <br />To <br />From: <br />David Cavazos <br />City Manager <br />William Galvez, Interim Executive Director <br />Public Works Agency <br />Date: June 26, 2014 <br />Project No. 06 -1723; First Street Bridge Replacement over the Santa Ana River; <br />Federal Project #BRLS -5063 (089) <br />Sul ject: Change Order No. 9 <br />Contractor: Powell Constructors <br />8555 Banana Avenue <br />Fontana, CA 92335 <br />Project Description: First Street Bridge Replacement over the Santa Ana River <br />Change Order Number: 9 Change Order Amount: $12,311.00 <br />Accounting Unit - Account - Activity Number: 05917660 -6620 06172302028 <br />JUSTIFICATION <br />While laying out the new planter located at the southwest corner of the bridge it was <br />determined that the design did not have sufficient reinforcement for the loads. Therefore <br />the reinforcement was modified for the existing conditions. Additionally while installing the <br />new streetlight it was determined that embedment depth for the streetlights needed to be <br />increased to accommodate code requirements. (PCO 44) <br />AGREED PRICE _ $5,729 <br />2. After completing the improvements in front of the mobile home park located at the <br />northwest corner of the bridge, the owners of the property informed the City that there may <br />be a conflict with the bike traffic and the motor vehicles exiting their property. The City <br />Traffic Engineering Section reviewed the situation and requested additional striping and <br />signage at that location. (PCO 45) <br />AGREED PRICE _ $6,213 <br />3. While performing a preliminary final job inspection it was determined that several areas <br />required additional landscaping to complete the intent of the design. (PCO 46). <br />AGREED PRICE _ $369 <br />
The URL can be used to link to this page
Your browser does not support the video tag.