My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />A. Executive Summary <br />The Final Environmental Impact Report (EIR) for the MacArthur Place South project was certified on <br />June 20, 2005. The project analyzed in the EIR was a mixed use development consisting of three 25-story <br />residential towers, three low rise condominium buildings, a six-story residential/office building with 10,000 <br />square feet of office and 14 residential loft units, and a single-story 13,871-square-foot retail building <br />consisting of 8,580 square feet of restaurant and 5,290 square feet of retail. The project site is located at the <br />southeast corner of MacArthur Boulevard and Main Street in southeast Santa Ana. East of the site is the <br />Costa Mesa Freeway (SR-55), south and east of the site is the City of Irvine, and the City of Costa Mesa is <br />located to the southwest. John Wayne Airport is approximately 1.1 miles south of the project site. <br />An Addendum to Final Environmental Impact Report No. (FEIR) 2004-02 was approved by the City in 2009 <br />(2009 Addendum). The 2009 Addendum reviewed the environmental impacts identified in the EIR in <br />relation to changes to the project after the EIR was certified. These included the elimination of the Cinema <br />Lofts (comprised of 14 residential units and 10,000 square feet of office use), removal of 13,871 square feet <br />of retail/restaurant uses, addition of a 185-room hotel, moving the Cinema Tower south of its approved <br />location, and the construction of a parking structure for joint use by the hotel and the Cinema Tower. While a <br />185-room hotel was analyzed in the Addendum, the final approval was for 155 rooms. An Initial Study <br />Checklist, pursuant to the California Environmental Quality Act (CEQA), was prepared. The Initial Study <br />and the Addendum fully complied with all relevant CEQA standards to determine if the EIR remained <br />adequate to address the impacts resulting from the project pursuant to CEQA Guidelines §15164. The <br />conclusion of the 2009 Addendum was that the modified project would not result in any new or more <br />significant environmental impacts. <br />This document constitutes a second Addendum to the FEIR for the MacArthur Place South project. This <br />Addendum reviews the environmental impacts identified in the FEIR in relation to changes to the project <br />after the FEIR was certified. The proposed changes include a modification to the low-rise condominium <br />component of the originally approved project. As approved in 2005, the condominiums would include three <br />buildings ranging in height from 50 to 60 feet (5 and 6 stories) with 276 residential units. A total of 689 <br />parking stalls would be provided in a two-level parking area consisting of one ground parking level and one <br />subterranean parking level. Recreation areas would be included in a ground-level interior courtyard and <br />consist of a water feature, a tot lot, a swimming pool, a game table, a barbeque area, and a seating area. The <br />modified project proposal increases the number of residences by 24, for a total of 300 residential units in <br />3 buildings with a maximum height of 65 feet. A parking structure will contain 29 fewer parking stalls for a <br />total of 660 parking stalls in 1 subterranean and 5 above-ground levels. A recreation deck on the parking <br />structure roof will contain amenities such as a swimming pool, cabanas, a tennis court, seating areas, <br />barbeque facilities, and a recreation building containing conference, fitness, game, exercise, and screen <br />rooms, in addition to a cafe/kitchenette, a business office, a billiard table, and storage. <br />B. Statutory Requirements <br />Pursuant to § 15367 of the CEQA Guidelines, the City of Santa Ana is the Lead Agency for this project. As <br />defined, the lead agency has the principal responsibility for carrying out or approving a project. This <br />Addendum updates the progress made in the project, as certified, and serves to update the information in the <br />EIR as contemplated in CEQA Guidelines §15164. This document will also be used to acknowledge the <br />addition of mitigation measures and further project modifications to the site. <br />The CEQA Guidelines (California Code of Regulations § 15000, et seq.) authorize the use of an Addendum <br />for the purpose of making minor or technical changes, as long as these changes do not rise to the level of <br />MacArthur Place South EIR - 2011 Addendum <br />75B-47
The URL can be used to link to this page
Your browser does not support the video tag.