My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:35 PM
Creation date
3/31/2011 2:19:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
4/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Request for Qualifications - Demolition Services <br />demolition survey. The Field Superintendent will confirm with the Project Manger that the <br />demolition area is ready for demolition. Structures ready for demolition-will be clearly marked <br />"CLEAR FOR DEMO J&G." <br />Field Superintendent will direct crews in: structure demolition; improvements demolition; <br />salvaging procedures; solid waste clearing and disposal. Where practical, concrete, asphalt, <br />steel, non-ferrous metals, and wood will be segregated and sent off-site for recycling. If <br />required, the site will be backfilled and graded. Field Superintendent will review fieldwork daily <br />for compliance with CTO specifications and record findings in a quality control log. <br />Field personnel are trained to stop work upon the discovery of suspect asbestos, regulated, or <br />hazardous waste. The Field Superintendent will contact the Project Manager, who in turn will <br />contact CSA. The Field Superintendent shall leave the work site in a clean and neat condition, <br />upon completion of the CTO. The Project Manager will notify those agencies required for final <br />inspections and sign offs. <br />The Project Manager will track the CTO schedule and budget by using project management <br />software. Schedule and budget updates will be provided to the CSA as required. Project <br />Manager will notify CSA to have all work inspected within 24 hours of CTO work completion. <br />The Project Manager will prepare all required paperwork for final closure package and billing <br />for the project. <br />Activities <br />Activities for the assigned personnel by job category include, but are not limited to: <br />Project Manager: <br />• First, managing services required to be performed within 24 hours of CTO execution <br />• Directing consultant to prepare a Notice of Intent (NOI) to comply with terms of general <br />permit to discharge storm water associated with construction activity, for sites that are one <br />acre or larger in size <br />• Submittal of the NO] and permit fee to the State Water Resources Control Board <br />• Directing consultant to prepare a Construction Storm Water Pollution Prevention Plan <br />(SWPPP), when required; storm water best management practices will be implemented as <br />J&G Industries Page 21 <br />25C-24
The URL can be used to link to this page
Your browser does not support the video tag.