My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:35 PM
Creation date
3/31/2011 2:19:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
4/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City,of Santa Ana . <br />Request for Qualifications - Demolition Services <br />needed for compliance with the SWPPP <br />Y Directing changes due to results of site safety inspections <br />= Contacting Underground Service Alert <br />A Contacting utility companies to coordinate any required utility terminations <br />Contacting CSA of any findings of Field Superintendent's visual survey of site for existing <br />improvements and utilities near the work site, and potential materials containing regulated/ <br />hazardous wastes <br />If requested, arranging for consultant to perform an asbestos and lead-based paint survey <br />and prepare an abatement plan for asbestos and lead containing materials removal and <br />disposal <br />When an asbestos and lead-based paint survey has been previously prepared, arranging <br />for consultant to prepare an abatement plan <br />» Submittal of abatement plan to SCAQMD, if applicable <br />r Confirming that all required licenses, permits and certifications have been acquired for <br />implementing the abatement plan <br />Submittal of the SCAQMD approved abatement plan for CSA approval to proceed with its <br />implementation <br />u Contacting CSA upon field superintendent notification field personnel have stopped work <br />upon the discovery of suspect asbestos, regulated, or hazardous waste <br />Notifying agencies required for final inspections and sign-offs <br />Tracking the CTO schedule and budget using project management software <br />Providing schedule and budget updates to CSA as required <br />Notifying OCTA to have all work inspected within 24 hours of CTO work completion <br />Preparation of all required paperwork for final closure package and billing for the project <br />Field Superintendent: <br />Conducting periodic tailgate Health & Safety meetings, to cover health and safety issues <br />with field workers <br />s Being an site at the time the agency is scheduled to inspect utility termination <br />n Visually surveying existing improvements and utilities near the work site, in order to protect <br />them from damage <br />Visually surveying the site for potential materials containing regulated/ hazardous wastes <br />Verifying waste is properly manifested for disposal at proper facility <br />J&G Industries Page 22 <br />25C-25
The URL can be used to link to this page
Your browser does not support the video tag.