Laserfiche WebLink
City,of Santa Ana . <br />Request for Qualifications - Demolition Services <br />needed for compliance with the SWPPP <br />Y Directing changes due to results of site safety inspections <br />= Contacting Underground Service Alert <br />A Contacting utility companies to coordinate any required utility terminations <br />Contacting CSA of any findings of Field Superintendent's visual survey of site for existing <br />improvements and utilities near the work site, and potential materials containing regulated/ <br />hazardous wastes <br />If requested, arranging for consultant to perform an asbestos and lead-based paint survey <br />and prepare an abatement plan for asbestos and lead containing materials removal and <br />disposal <br />When an asbestos and lead-based paint survey has been previously prepared, arranging <br />for consultant to prepare an abatement plan <br />» Submittal of abatement plan to SCAQMD, if applicable <br />r Confirming that all required licenses, permits and certifications have been acquired for <br />implementing the abatement plan <br />Submittal of the SCAQMD approved abatement plan for CSA approval to proceed with its <br />implementation <br />u Contacting CSA upon field superintendent notification field personnel have stopped work <br />upon the discovery of suspect asbestos, regulated, or hazardous waste <br />Notifying agencies required for final inspections and sign-offs <br />Tracking the CTO schedule and budget using project management software <br />Providing schedule and budget updates to CSA as required <br />Notifying OCTA to have all work inspected within 24 hours of CTO work completion <br />Preparation of all required paperwork for final closure package and billing for the project <br />Field Superintendent: <br />Conducting periodic tailgate Health & Safety meetings, to cover health and safety issues <br />with field workers <br />s Being an site at the time the agency is scheduled to inspect utility termination <br />n Visually surveying existing improvements and utilities near the work site, in order to protect <br />them from damage <br />Visually surveying the site for potential materials containing regulated/ hazardous wastes <br />Verifying waste is properly manifested for disposal at proper facility <br />J&G Industries Page 22 <br />25C-25