My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:35 PM
Creation date
3/31/2011 2:19:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
4/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Request for Qualifications - Demolition Services <br />Project Schedule <br />CTOs are expected to be completed within the following schedule: <br />First 24-hour tasks (fencing, boarding, etc.) - 1 day <br />Notifications / Permits - 3 to 10 days <br />Mobilization (H&SP, SWPPP, USA, terminate utilities pre-demolition as required, <br />Asbestos/Lead Plan) -- 3 to 7 days <br />Asbestos/Lead Abatement - 2 to 5 days <br />Pre-demolition Survey - 1 day <br />Demolition (salvaging procedures, interior, structure) -- 1 to 8 days <br />She Backfilling 1 Grading - 1 to 3 days <br />Demobilization - 1 to 3 days <br />PROJECT DURATION - 13 to 38 days <br />Some tasks may run concurrently, which will shorten the project duration shown above. <br />Quality Control <br />J&G uses quality, schedule and budget control procedures in the office and field management <br />of each CTO. Project schedules and work sub-task costs are prepared to start each CTO. The <br />Project Manager will track the CTO schedule and budget by using project management <br />software. Schedule and budget updates will be provided to the OCTA as required. J&G office <br />staff assists the Project Manager in maintaining a project file (notification records, agency <br />points of contact, etc.) for each CTO. Project Manager will notify CSA to have all work <br />inspected within 24 hours of CTO work completion. The Project Manager will prepare all <br />required paperwork for final closure package and billing for the project. <br />J&G's project files will be available for inspections by the CSA, county, state and federal <br />representatives, and shall be submitted to the CSA when requested. <br />At the start of the CTO, the Field Superintendent will visually survey existing improvements <br />and utilities near the work site, in order to protect them from damage. Field Superintendent will <br />also visually survey the site for potential materials containing regulated/hazardous wastes. The <br />J&G Industries Page 24 <br />25C-27