My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:35 PM
Creation date
3/31/2011 2:19:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
4/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Request for Qualifications - Demolition Services <br />Conducting a pre-demolition survey upon completion of abatement plan implementation to <br />identify: that the asbestos, lead, regulated and hazardous wastes have been removed as <br />per their abatement plans; verify monitoring records; verify proper manifesting of waste <br />disposal; visually verify no other hazardous materials are left in demolition area; as <br />required, verify site is secured by appropriate fencing; verify that appropriate protection <br />devices are in place, such as pedestrian protection canopy; verify appropriate signing <br />displayed (i.e. no trespassing, keep out demolition in progress, danger, etc.); verify all <br />utilities have been terminated; and erosion control measures are in place, as needed and <br />required <br />Using a checklist to complete the pre-demolition survey <br />Y Confirming with the Project Manger that the demolition area is ready for demolition <br />Directing crews in structure demolition; improvements demolition; salvaging procedures; <br />and solid waste clearing and disposal <br />Reviewing fieldwork daily for compliance with CTO specifications and recording findings in <br />a quality control log <br />Notifying the Project Manager when field personnel stop work upon the discovery of <br />suspect asbestos, regulated, or hazardous waste <br />Leave the work site in a clean and neat condition, upon completion of the CTO <br />Safety Officer: <br />Preparation of site specific Health & Safety Plan <br />Periodically conducting site safety inspections <br />Engineering / Environmental Consultant: <br />SWPPP preparation <br />Removal and disposal of contaminated soil (Rule 9 1 66) <br />Engineering of structure demolition <br />Available to address other issues of environmental concern discovered during demolition <br />J&G Industries Page 23 <br />25C-26
The URL can be used to link to this page
Your browser does not support the video tag.