My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - NPDES INSPECTION SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
25D - AGMT - NPDES INSPECTION SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:37 PM
Creation date
3/31/2011 2:35:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
4/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />of all our inspectors prior to working for the City. In addition to the training program developed, <br />our field inspection staff regularly meet to discuss various scenarios /activities encountered in the <br />field. <br />Cost control begins with careful planning and accurate cost estimating, and continues throughout <br />the project with forecasting of work and mitigation of unexpected conditions or events. AMEC uses <br />a real-time web-based cost accounting system allowing instant access to project financials. AMEC <br />project managers are evaluated on the ability to deliver a quality product in accordance within the <br />negotiated scope and budget. Through technical innovation, stakeholder interaction, and excellent <br />project management skills, AMEC has been able to implement numerous cost-saving measures for <br />clients. <br />3.5 AREAS OF CONCERN <br />Through our years of experience performing inspections at industrial/commercial sites, we have <br />experience dealing with difficult situations including hostile business representatives. Safety of our <br />inspectors is our most critical area of concern. Our inspectors are familiar with typical safety <br />hazards associated with field inspections at various industrial and commercial operations. When a <br />serious hazard is present that prevents safe completion of a site inspection, the inspection will be <br />stopped immediately and the City will be notified. Our field staff are 40-hour FIAZWOPER <br />certified and are familiar with general safety precautions including the proper use of personal <br />protective equipment, safe driving techniques, and traffic control. Field personnel will, at minimum, <br />adhere to site-specific safety requirements prescribed by the individual facilities being inspected. <br />3.6 SCOPE ENHANCEMENTS <br />We are always looking for ways to improve or make the inspection process more efficient and cost <br />effective. If interested, we can work with the City to develop electronic or web-based file sharing <br />L\MARKF."C\Pmp,-1,\2011 Propo-k\1IPROPII0II1.11023\Ciq-oESanm Ana\t IPROP 2 6 D-"'3ro 14
The URL can be used to link to this page
Your browser does not support the video tag.