My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
relation to the progress scheduled. The progress report shall discuss <br />significant issues and present proposed corrective action, show status of <br />major changes, and identify next month's activities. The Consultant shall <br />provide the City with two (2) copies of the progress report. <br />Deliverables — Monthly Progress Reports submitted in both hard copy and <br />electronic format. <br />B. Permits <br />The Consultant shall be responsible for securing all necessary encroachment <br />permits for field studies and work related to document preparation, such as <br />surveying and geotechnical activities. Additionally, the Consultant shall <br />submit any required traffic control plan to the City for review and concurrence <br />prior to beginning any field study. The Consultant shall obtain necessary <br />training including applicable rail safety program prior to performing field study. <br />The Consultant shall identify all potential project -related permit requirements <br />in the PSRE and include the cost in the cost estimate. <br />Deliverables — Documentation of all potential project -related permit <br />requirements. <br />C. Research & Data Collection <br />The Consultant shall thoroughly research and collect information related to <br />the PROJECT, including existing field conditions, as -built plans, studies, <br />encumbrances and record drawings (including utilities), reports, agreements, <br />right-of-way data, and all future improvement plans adjacent to or affecting <br />the project site. The Consultant shall review and document the collected <br />data, physical constraints, and deficiencies and include the cost estimate for <br />design solutions. <br />Deliverables — Documentation of pertinent project information including <br />photographs, mapping, schematics, field notes, existing studies and any study <br />findings. <br />D. Utility Survey <br />The proposed grade separation will greatly impact public services and utilities. <br />The Consultant shall conduct a survey that identifies all impacts to these <br />facilities and is solely responsible to conduct all necessary research to <br />complete this task. City staff will be available to answer questions and <br />provide guidance. At a minimum, the Consultant shall consult with Public <br />Works Agency staff and the following service and utility providers: <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.