My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
streets, topography, building foot prints (including set -back to proposed right- <br />of-way lines), parcel numbers, addresses, indication of full or partial take of <br />each property and amount of right-of-way needed per parcel for each <br />alternative. The Consultant shall identify in detail any loss of on-site parking <br />for each parcel affected by the PROJECT. The Consultant shall submit the <br />right-of-way map to the City and participating agencies for review and <br />approval. Final maps shall be delivered on mylar and electronically as both <br />.PDF and .DGN files. All electronic files related to the right-of-way maps shall <br />become property of the City. <br />Following approval of the right-of-way map, the Consultant shall prepare a <br />cost estimate for acquiring right-of-way. The Consultant shall provide <br />sufficient information to the City to facilitate the preparation of cost estimates <br />for land acquisition, structure demolition, relocation, administration and other <br />miscellaneous costs. The Consultant shall identify the public improvements <br />cost per parcel for the purpose of right-of-way dedication in exchange for <br />public improvements for all partial takes. The Consultant shall utilize a <br />California licensed land surveyor to prepare legal descriptions and exhibits for <br />all partial and full takes as well as a plan for the reuse of remnant parcels of <br />the partial takes. <br />Deliverables — Right -of -Way survey. <br />M. Cost Estimates <br />The Consultant shall prepare a cost estimate for final design, shoofly, <br />permitting, right-of-way acquisition, TMP, construction, utilities relocation, and <br />potential mitigation measures. The construction estimate shall include details <br />of estimated quantities and unit costs for major items of work based on <br />current prices. The Consultant shall verify current prices with manufacturers, <br />material suppliers and contractors. The cost estimates shall be prepared for <br />each alternative and submitted at each milestone along with the conceptual <br />engineering plans. <br />Deliverables —Cost Estimates. <br />N. Environmental Evaluation <br />The Consultant shall prepare the environmental evaluation documents for the <br />PROJECT in accordance with CEQA and NEPA guidelines. The procedures <br />shall include the City of Santa Ana adopted environmental rules for the <br />implementation of CEQA and NEPA. The Consultant shall prepare the <br />Preliminary Environmental Analysis Report (PEAR) in accordance to Caltrans <br />PEAR Handbook to comply with the requirement of the PSRE. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.