My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
affected persons and then bound in appropriate job files. The City of Santa <br />Ana reserves the right to request proof of said documentation. <br />F. Manuals/Standards - Where applicable, engineering design of all PROJECT <br />improvements shall be compatible and in accordance with the following, but <br />not limited to: <br />• A Policy on Geometric Design of Highways and Streets (AASHTO) <br />• CPUC General Orders Requirements <br />• California Regional Water Quality Control Board Requirements <br />• Manual of Uniform Traffic Control Devices (MUTCD) <br />• Standard Specifications for Public Works Construction (SSPWC) <br />• Caltrans Project Development Procedures Manual (PDPM) <br />• Caltrans Highway Design Manual <br />• Caltrans Guidelines for Preparing a Preliminary Environmental Analysis <br />Report (PEAR) <br />• Caltrans Standard Environmental Reference <br />• OCTA Right of Way Manual <br />• BNSF Design Guidelines for Industrial Track Projects <br />• BNSF Utility Accommodation Policy <br />• SCRRA Grade Separation Guidelines <br />• City of Santa Ana Standard Plans and Specifications <br />It shall be the responsibility of the Consultant to verify that the latest version <br />and/or update of these documents are obtained. <br />G. The Consultant's work will be subject to inspections by representatives of the <br />City of Santa Ana and other involved agencies. <br />VI. PROJECT BUDGET <br />The maximum project budget for performing all tasks defined in the scope of <br />work is $1.3 million. <br />VII. PERFORMANCE PERIOD <br />A. The contract shall begin upon approval by the City Council, and the <br />Consultant shall commence work after notification to proceed by the City. <br />Unless extended by contract amendment, the contract shall terminate upon <br />acceptance by the City of Santa Ana of the PROJECT and upon completion <br />of the terms of this agreement by the Consultant. <br />B. The Consultant is advised that any recommendation for contract award is not <br />binding on the City until the Agreement and all pertinent paperwork are fully <br />executed and approved by the City Council. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.