Laserfiche WebLink
® AECOM 190 <br />Team Organization <br />Project Manager, James Faber, has developed our project organization focused on providing comprehensive coverage of <br />the main project functions. Where applicable, James reached out to subconsultant firms where we have a strong working <br />relationship. The project organization chart in Figure 10 shows the lines of communication and areas of subcontract work. <br />James Faber will serve as the single point of contact and be solely responsible ford irecting the team as we work together to <br />deliver this project for the City of Santa Ana. <br />. Dual Role <br />All staff are AECOM, except as noted: <br />C = Coast Surveying <br />E = Earth Mechanics <br />J = Jones & Stokes <br />0 = Overland Pacific Cutler <br />Figure 10. Organization Chart <br />The key personnel delivering the PS&E are available to perform the work and are committed for the duration of the contract. <br />Figure 11 identifies their current assignments and average availability through the life of the project. <br />Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Boulevard Grade Separation Project <br />