My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19D - RFP - PRE-PRELIMINARY ENGINEERING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
19D - RFP - PRE-PRELIMINARY ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:46:51 PM
Creation date
4/14/2011 3:30:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19D
Date
4/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. The FMP shall include operating and financial data such as current estimates of <br />vehicle operating costs, reliability and life expectancy, for decision-making and <br />performance review. <br />D. The FMP shall be formatted and calculated in conformance with FTA Circular <br />9030.1 D, specifically with respect to: <br />a. Definition of terms, <br />b. Description of existing system and expansion plans, both project and non- <br />project related, <br />c. Justification of the demand for revenue vehicles and operating spare ratio, <br />d. Process for reconciling demand versus supply to determine if additional <br />vehicles will be needed, overhauled, procured or other changes in <br />maintenance practices, inventory, information technology, capital <br />investment will be implemented instead; <br />e. Preventive maintenance schedule for the procured/overhauled rail car <br />fleet; <br />f. Grantee's reliability program, past performance and plans to improve <br />reliability including profile monitoring and support of maintenance, failure <br />rates and rail cars out-of-service, and train failure definitions and actions; <br />E. The FMP shall discuss the selection and specification of vehicle equipment and <br />systems and how the specifications matched the appropriate technology with the <br />planned transit applications for the best performance at the lowest cost. <br />F. The FMP shall ensure that the project's estimates of costs, service levels, quality, <br />or reliability are mechanically correct and complete, consistent with the grantee- <br />defined methodologies and free of any material inaccuracies or incomplete data. <br />G. The FMP shall discuss the project's forecasts and schedule, to be consistent with <br />the plan scope and project scope adopted in the Record of Decision (if <br />applicable) and the proposed Revenue Operations Date and shall free of any <br />material inaccuracies or incomplete data. <br />Task 4 Deliverables: <br />1. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft <br />Office Excel 2007 format) and 12 hard copies of the draft FMP <br />13 <br />19D-8
The URL can be used to link to this page
Your browser does not support the video tag.