My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 - JOINT - Lacy Settlement
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
04/18/2011
>
03 - JOINT - Lacy Settlement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:32:41 PM
Creation date
4/19/2011 2:45:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
03
Date
4/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LTtilities/Public Imuravements <br />Phase R-1 will include utility connections and hookups to sewers, drains, water and gas <br />distribution lines, electric and telephone lines. The project will include curb, gutter and sidewalk <br />replacement around the periphery of the project site where needed and all necessary dedications <br />and improvements to establish 17" x 17" corner cutoffs and wheelchair ramps at street <br />intersections. Phase R-1 may also include sewer, street, and water main improvements as <br />required by prof ect Land Use Entitlements. <br />Amenities <br />Phase R-1 will have an on-site resident manager and property management offices on site. Tt <br />will include a community room and on-site laundry facilities. Multiple coiutyard areas will be <br />provided as common outdoor space atop the parking podium. Ground floor units will have <br />stoop/porch areas oriented to the street. <br />Public Art -- See Section 305.2. <br />Child Care Facilities -- See Section 305.3. <br />Retail Spaces --See Section 305.4. <br />Sustainability <br />Phase R-1 will include several key sustainability features to ensure efficient use of natural <br />resources. These may include use of water efficient fixhires in bathrooms and kitchens, use of <br />low or no-VOC primers, sealants and adhesives, use of natural ventilation where feasible and/or <br />use of recycled building materials. <br />3-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.