My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 - JOINT - Lacy Settlement
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
04/18/2011
>
03 - JOINT - Lacy Settlement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:32:41 PM
Creation date
4/19/2011 2:45:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
03
Date
4/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHAS11 R-2: <br />Proiect Descriutiou <br />Phase R-2 consists of approximately 39 residential units including approximately 25 new <br />constriction zmifs and approxunately 14 units which will be rehabilitated from existing strictures <br />either currently located or to be relocated on to the project sites. Phase R-2 will be designed to <br />provide affordable rental housing for families, with one unit reserved for afull-time, on-site <br />property manager. The unit mix for the 25 new construction units includes 15 2-bedroom and 10 <br />3-bedroom units. The units to be rehabilitated include a range of 1-4 Bedroom units which may <br />either be rehabilitated with existing floorplans or reconfigured into alternate unit types. <br />Phase R-2 will be constructed on approximately 2.49 acres~on six scattered sites identified on the <br />Site Map as "Lot 2," "Lot 3," "Lot A," "Lot C," "Lot D," and "Lot E." All units in Phase R-2 <br />will have long term affordability covenants restricting tenancy to qualifying households. <br />The new construction component of Phase R-2 is designed as at-grade wood frame construction <br />includuig a mix of two-story attached townhomes and single story flats. Parking for the new <br />consh~iction component of R-2 is provided in a combination of detached and "tuck under" <br />garages in ratios that satisfy the requirements of the Transit Zoning Cade. The rehabilitation <br />component of Phase R-2 will include rehabilitation of existing single family and multifamily <br />residential structures and will provide either open parl~ing or at grade parking garages as space <br />permits on site and/or per niiuucipal code standards, as applicable. <br />Additional Pra erties <br />609 E. Fifth Street has been identified as an Additional Property with respect to Phase R-2. <br />Suns <br />All signage on the premises shall be designed to meet applicable zoning codes. <br />Landscanin~ <br />Project landscaping shall be designed to maximize opport~ulities for on-site stormwater detention <br />in areas not utilized for buildings, driveways and parking. Landscape elements may include <br />planters, terraces, trees, decorative walls, screenings, barbeques, benches, and paving elements. <br />Planted areas will be equipped with permanent water sprinkler systems to ensure proper <br />maintenance. Final landscape/outdoor amenity plan will be subject to Agency review and <br />approval. <br />Utilities/Public Improvements <br />Proj ect will inchtde utility connections and hookups to sewers, drains, water and gas distribution <br />Lines, electric and telephone lines. The project will include curb, gutter and sidewalk <br />replacement around the periphery of the project site where needed and all necessary dedications <br />3-31 <br />