My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 - JOINT - Lacy Settlement
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
04/18/2011
>
03 - JOINT - Lacy Settlement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:32:41 PM
Creation date
4/19/2011 2:45:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
03
Date
4/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and improvements to establish 17" x 17" corner cutoffs and wheelchair ramps at street <br />intersections. Phase R-2 may also include sewer, street, and water main improvements as <br />required by project Land Use Approvals. <br />Amenities <br />The new construction component of Phase R-2 will contain two on-site laundry facilities (one for <br />each of the two new construction sites}, and individual porches/patios for private open space as <br />well as landscaped and hndscaped common open space areas on each of the three sites. All <br />Phase R-2 residents will have access to the community room and any programming and services <br />provided in Phase R-1. The rehabilitated units will be provided with either individual or shared <br />washer/dryer units subject to Agency staff s approval. The properties to be rehabilitated will be <br />landscaped and provided with patios/porches, as space and/or miulicipal standards permit, <br />subject to plans to be approved by the City and Agency. Public art will be provided either on <br />site or off site consistent with the terms in the Agreement. <br />Sustainability <br />The project will include several key sustainability features to ensure efficient use of nattrral <br />resources. These may include use of water efficient fixtures in bathrooms and kitchens, use of <br />low or no-HOC primers, sealants and adhesives, use of natural ventilation where feasible and/or <br />use of recycled building materials. <br />3-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.