My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2014 11:48:24 AM
Creation date
4/22/2011 1:51:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-022
Date
4/4/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This section documents the Existing (2010) Conditions in the study area. The discussion presented here <br />is limited to specific roadways, transit routes, and bikeways in the project's vicinity. <br />Existing Roadway Conditions <br />KOA conducted an updated field review for this project. Due to significant land use development in <br />recent years, there are some significant roadway and intersection improvements within the study area <br />that have changed since the original traffic study was conducted. Streets in the project vicinity that <br />could be affected by the proposed expansion project include Main Street, MacArthur Boulevard, Dyer <br />Road, Sandpointe Avenue, Sunflower Avenue, Imperial Promenade, and Red Hill Avenue. <br />Main Street <br />Main Street is a north -south arterial roadway in the project vicinity, located west of and adjacent to the <br />project site. Main Street is designated as a 6 lane Major Arterial on the Orange County Master Plan of <br />Arterial Highways (MPAH). The posted speed limit along Main Street is 40 mph. <br />The intersection of Main Street at MacArthur Boulevard has been recently improved and fully built out <br />since the original traffic study. Exclusive right turn lanes have been constructed for all approaches of the <br />intersection. Main Street is served by OCTA Routes 53, 463 and 794. There are no striped bike lanes <br />provided on Main Street. <br />MacArthur Boulevard <br />MacArthur Boulevard is an east -west roadway in the project vicinity, located adjacent to and north of <br />the project site. The arterial has a full interchange with the SR -55 Freeway. Within the study area, <br />MacArthur Boulevard is designated as a 6 lane Major Arterial on the MPAH. The posted speed limit <br />along MacArthur Boulevard is 45 mph. <br />MacArthur Boulevard is served by OCTA Routes 55, 76, 464, and 794. There are no striped bike lanes <br />provided on MacArthur Boulevard. <br />Dyer Road <br />Dyer Road is an east -west roadway located about `/2 mile north of the project area. The roadway <br />provides a full interchange with the SR -55 Freeway. Dyer Road is designated as a 6 lane Major Arterial <br />on the MPAH. The posted speed limit along Dyer Road is 40 mph. <br />Dyer Road is not served by OCTA bus routes and there are no striped bike lanes provided on Dyer <br />Road. <br />KOA CORPORATION updated Main and MacArthur Development Project <br />PLANNING & ENGINEERING 8 Traffic Impact Study in City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.