My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2014 11:48:24 AM
Creation date
4/22/2011 1:51:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-022
Date
4/4/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Issues and Supporting Information Sources <br />VII. Greenhouse Gas Emissions — Would the project: <br />a) Generate greenhouse gas emissions, either directly or indirectly, that may <br />have a significant impact on the environment? <br />b) Conflict with an applicable plan, policy or regulation adopted for the <br />purpose of reducing the emissions of greenhouse gases? <br />VIII. Hazards and Hazardous Materials — Would the project: <br />a) Create a significant hazard to the public or the environment through the <br />routine transport, use or disposal of hazardous materials? <br />b) Create a significant hazard to the public or the environment through <br />reasonably foreseeable upset and accident conditions involving the release <br />of hazardous materials into the environment. <br />c) Emit hazardous emissions or handle hazardous or acutely hazardous <br />materials, substance or waste within one - quarter mile of an existing or <br />proposed school? <br />d) Be located on a site which is located on a list of hazardous materials sites <br />compiled pursuant to Govemment Code Section 65962.5 and, as a result, <br />would it create a significant hazard to the public or the environment? <br />e) For a project located within an airport land use plan or where such a plan <br />has not been adopted, within two miles where of a public airport or public <br />use airport, would the project result in a safety hazard for people residing <br />or working in the project area? <br />f) For project within the vicinity of a private airstrip, would the project result in <br />a safety hazard for people residing or working in the project area? <br />g) Impair implementation of or physically interfere with an adopted emergency <br />response plan or emergency evacuation plan? <br />h) Expose people or structures to a significant risk of loss, injury or death <br />involving wild fires, including where wildlands are adjacent to urbanized <br />areas or where residences are intermixed with wildlands? <br />IX. Hydrology and Water Quality — Would the project: <br />a) Violate any Regional Water Quality Control Board water quality standards <br />or waste discharge requirements? <br />b) Substantially deplete groundwater supplies or interfere substantially with <br />groundwater recharge such that there would be a net deficit in aquifer <br />volume or a lowering of the local groundwater table level (i.e., the <br />production rate of pre- existing nearby wells would drop to a level which <br />would not support existing land uses or planned uses for which permits <br />have been granted)? <br />c) Substantially alter the existing drainage pattern of the site or area, including <br />through the alteration of the course of a stream or river, in a manner which <br />would result in substantial erosion or siltation on- or off -site, or substantially <br />increase the rate or amount of surface runoff in a manner which would <br />result in flooding on or off -site? <br />Responses to <br />Environmental Checklist <br />For CEQA Compliance <br />1:1 1:1 X <br />MacArthur Place South EIR -- 2011 Addendum 54 <br />No Substantial <br />New <br />change from <br />Significant <br />More Severe <br />Previous <br />Impact <br />Impacts <br />Analysis <br />1:1 1:1 X <br />MacArthur Place South EIR -- 2011 Addendum 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.