My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2E -2008
Clerk
>
Contracts / Agreements
>
I
>
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2E -2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2014 4:16:42 PM
Creation date
4/27/2011 11:00:15 AM
Metadata
Fields
Template:
Contracts
Company Name
Infor (US) Inc. (Formerly LAWSON SOFTWARE) 2e
Contract #
A-2008-037-05
Agency
Finance & Management Services
Notes
Name change as of 7/1/12 This is 5th amendment (A-2010-068 is 4th amend-see Agmt. database) No Council approval required for this agmt, funds still available under orginal agmt Per L. Sheedy, City Attorney Ofc. Term Exp. is UC, and No Ins. required
Document Relationships
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2 - 2008
(Amends)
Path:
\Contracts / Agreements\I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule 1 to <br />PRODUCT ORDER FORM <br />hardware platform(s) on which the corresponding Software designated as MCPUC (if any) in the <br />Schedule(s) to this POF may be installed and/or run. <br />5.3 MP means Maximum Persons, which is the maximum number of persons deriving benefit from the use of <br />the Products designated as MP (if any) in the Schedule(s) to this POF, including without limitation any <br />person for whom data is maintained using those Products (for example, full time and part time <br />employees, volunteers, pensioners, temporary workers, seasonal workers, contractors and consultants). <br />5.4 MS means Maximum Servers, which is the maximum number of physical hardware servers on which <br />each Product designated as MS (if any) in the Schedule(s) to this POF, may be installed. <br />5.5 MUC means Maximum Users Concurrent, which is the maximum number of individuals authorized by <br />Customer to be the number of peak simultaneous users running any on-line program within an <br />application, designated as MUC (if any) in the Schedule(s) to this POF. <br />5.6 MUN means Maximum Users Named, which is the maximum number of individuals (Named Users) that <br />may be authorized by Customer to use the respective specific Product designated as MUN (if any) in the <br />Schedule(s) to this POF, regardless of whether the individual is actively using the Product at any given <br />time. A Named User of one Product designated as MUN may not use other Products designated as <br />MUN, unless Customer has obtained a License for that Named User to use each of those specific <br />Products designated as MUN. <br />5.7 MUS means Maximum Users Seats, which is the maximum number of Customer's workstations on which <br />the Products maybe installed, designated as MUS (if any) in the Schedule(s) to this POF. <br />6. Non-Production Use of Certain Products. <br />6.1 Development/Test and Training. The following applies to any Lawson Products (excluding System <br />Foundation) listed on the Schedule(s) to this POR (a) Customer may install those Products on one <br />development/test server and on one training server (in addition to the licensed production server(s)), (b) <br />Customer may allow up to 10 Users (in addition to the maximum number of Users shown on the <br />Schedule(s) to this POF) to use those Products for development and testing, with a database that is <br />separate from any production database and (c) Customer may allow its Users (within the Maximum Use <br />Designations) to use those Products for training. System Foundation Products and Third Party Products <br />are licensed separately for development/testing and training, and may be used for development/testing <br />and/or training only if designated for that purpose in a Schedule to a POF. , <br />6.2 Disaster Recovery and Failover. If any Products listed in the Schedule(s) to this POF are designated as <br />Disaster Recovery or Failover, Customer may. (a) install those Disaster Recovery Products on only one <br />Disaster Recovery server and install those Failover Products on only one Failover server, (b) use the <br />Disaster Recovery Products and the Failover Products to test those servers, and (c) use the Disaster <br />Recovery Products and the Failover Products in production, only as long as the primary production <br />system is inoperable. <br />Product Order Form - English 3(3) <br />Revised September 4, 2009 <br />Last Update May 5, 2010 <br />Order Form No: 00014521.0
The URL can be used to link to this page
Your browser does not support the video tag.