My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - SECURITY SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
05/02/2011
>
25C - AGMT - SECURITY SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:45:41 PM
Creation date
4/28/2011 11:06:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/2/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Patrol restrooms, main floor lobby, train loading areas, balconies and upper floors of the <br />building, perimeter of entire facility, parking lots, parking structure, pedestrian bridge, east <br />and west platforms and all approaches onto the property. <br />• Maintain facility in lockdown mode when the facility is closed, unless an emergency arises <br />and respond only at the direction of SARTC management or emergency services. <br />• Ensure that unauthorized taxis, limousines, buses, etc. do not assemble on or adjacent to the <br />property. <br />• Provide vehicle and parking control throughout the facility as needed. <br />• Provide surveillance of trains, buses and passenger movement. <br />• Enforce the facility's unattended baggage policy and follow appropriate procedures. <br />• Lock down or open the facility at designated times. This will include main building, parking <br />structure and pedestrian bridge accesses. <br />• Report to SARTC management any light outages, improperly working doors and/or locks, <br />building leaks or leaks of any kind, any abnormality in function of mechanical, electrical or <br />plumbing systems, graffiti locations, suspected or observed theft or vandalism. <br />• Raise and lower flags at dawn and dusk. <br />• Check in and check out all contract personnel and provide access to service areas as <br />necessary. <br />II. RESPONSIBILITY OF CONTRACTOR <br />Provide a post management system that includes efficient mechanisms for tour verification, daily <br />activity reports (DARs), and incident reporting (IR). This system must be complete with a <br />reliable computer equipped with Internet access, Microsoft Office, a printer, downloader, and <br />any other equipment needed in leading and monitoring the security needs of the facility. <br />Provide for the SARTC CPO Post Commander (Account Manager) to travel and board in <br />Sacramento to job shadow with Jacob Culberson and the SRT security staff to cross train (16 <br />hours) on transit issues and incorporate best practices for SARTC. <br />Ensure that SARTC is secure at all times by providing security coverage as outlined in Exhibit 6 <br />Each security guard shall utilize Secure Trax devices to perform their duties. <br />Provide two Secure Trax devices for use at the SARTC. <br />Provide cellular phones and all other telecommunications or electronic equipment necessary for <br />all security officers while on duty. <br />Provide internal transportation equipment, if any, such as scooters, Segways, etc. <br />25C-15
The URL can be used to link to this page
Your browser does not support the video tag.