Laserfiche WebLink
Chapter 2 CEQA Findings <br /> <br /> <br />Impact Statement <br /> <br />Evidence/Rationale Supporting Findings <br /> <br />Mitigation Measures <br /> <br />Findings Level of <br />Significance after <br />Mitigation <br /> Quality Management District Rule 403- <br /> Fugitive Dust, all construction activities that <br /> are capable of generating fugitive dust are <br /> required to implement dust control measures <br /> during each phase of project development to <br /> reduce the amount of particulate matter <br /> entrained in the ambient air. These measures <br /> include the following: <br /> ¦ Application of soil stabilizers to inactive <br /> construction areas <br /> ¦ Quick replacement of ground cover in <br /> disturbed areas <br /> ¦ Watering of exposed surfaces three times <br /> daily <br /> ¦ Watering of all unpaved haul roads three <br /> times daily <br /> ¦ Covering all stock piles with tarp <br /> ¦ Reduction of vehicle speed on unpaved <br /> roads <br /> ¦ Post signs on-site limiting traffic to <br /> 15 miles per hour or less <br /> ¦ Sweep streets adjacent to the project site <br /> at the end of the day if visible soil material <br /> is carried over to adjacent roads <br /> ¦ Cover or have water applied to the <br /> exposed surface of all trucks hauling dirt, <br /> sand, soil, or other loose materials prior <br /> to leaving the site to prevent dust from <br /> impacting the surrounding areas <br /> ¦ Install wheel washers where vehicles <br /> enter and exit unpaved roads onto paved <br /> roads to wash off trucks and any <br /> equipment leaving the site each trip <br />Transit Zoning Code (SD 84) EIR Findings of Fact/Statement of Overriding Considerations 2-7