Chapter 2 CEQA Findings <br /> <br /> <br />Impact Statement <br /> <br />Evidence/Rationale Supporting Findings <br /> <br />Mitigation Measures <br /> <br />Findings Level of <br />Significance after <br />Mitigation <br /> MM4.2-13 The developer shall require by <br /> contract specifications that construction- <br /> related equipment, including heavy-duty <br /> equipment, motor vehicles, and portable <br /> equipment, shall be turned off when not in <br /> use for more than 30 minutes. Diesel-fueled <br /> commercial motor vehicles with gross <br /> vehicular weight ratings of greater than <br /> 10,000 pounds shall be turned off when not in <br /> use for more than 5 minutes. Contract <br /> specifications shall be included in the <br /> proposed project construction documents, <br /> which shall be approved by the City of Santa <br /> Ana. <br /> MM4.2-14 The developer shall require by <br /> contract specifications that construction <br /> parking be configured to minimize traffic <br /> interference during the construction period <br /> and, therefore, reduce idling of traffic. <br /> Contract specifications shall be included in <br /> the proposed project construction documents, <br /> which shall be approved by the City of Santa <br /> Ana. <br /> MM4.2-15 The developer shall require by <br /> contract specifications that temporary traffic <br /> controls are provided, such as a flag person, <br /> during all phases of construction to maintain <br /> smooth traffic flow. Contract specifications <br /> shall be included in the proposed project <br /> construction documents, which shall be <br /> approved by the City of Santa Ana. <br /> MM4.2-16 The developer shall require by <br /> contract specifications that construction <br /> activities that affect traffic flow on the arterial <br /> system by scheduled to off-peak hours <br />2-8 Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding Considerations