My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-005 CRA
Clerk
>
Resolutions
>
COMMUNITY REDEVELOPMENT AGENCY (1974-2012)
>
2010-2012
>
2011
>
2011-005 CRA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:20:39 PM
Creation date
5/4/2011 11:09:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-005 CRA
Date
4/18/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 2 CEQA Findings <br /> <br /> <br />Impact Statement <br /> <br />Evidence/Rationale Supporting Findings <br /> <br />Mitigation Measures <br /> <br />Findings Level of <br />Significance after <br />Mitigation <br />hazardous materials sites hazardous substances in the soil, project which would avoid or substantially <br />and as a result, would create including underground storage tanks, and lessen the significant environmental effect as <br />a significant hazard to the small-quantity generators of hazardous identified in the final EIR. <br />public or environment. waste. However, implementation of <br /> mitigation measures MM4.5-1 and <br /> MM4.5-2 would ensure that contaminated <br /> sites undergo remediation activities prior <br /> to development activities, thus reducing <br /> the impacts below a level of significance. <br /> Discussion is provided on page 4.5-18 of <br /> the DEIR. <br /> For each of the parcels that are a <br /> proposed as part of the Developer Project, <br /> Phase I Environmental Site Assessments <br /> (ESAs) were conducted by Converse <br /> Consultants in April 2010 in accordance <br /> with ASTM Practice E1527-05 standards. <br /> The proposed project area was assessed <br /> by block; thirteen separate ESAs were <br /> prepared. The ESAs were prepared using <br /> and extensive record search as well as <br /> field reconnaissance surveys. The results <br /> of these ESA are summarized in the <br /> Chapter 2 of the Final EIR (Changes to <br /> the Draft EIR). The ESAs concluded that <br /> no further investigation was needed, with <br /> the exception of soil vapor surveys on <br /> Blocks 1 and 6. In accordance with <br /> mitigation measure MM4.5-1, the project <br /> Applicant would be required to undertake <br /> a Phase II ESA soil sampling plan to <br /> ensure that potential impacts remain less <br /> than significant. <br />Impact 4.5-5 Construction The Transit Zoning Code area is located MM4.5-4 For development of structures that Finding 1 Less than <br />activities associated with the in the John Wayne Airport (SNA) Planning exceed 200 feet in height above ground level <br />2-28 Revised Station District Project and FOIL Settlement Agreement Findings of Fact/Statement of Overriding Considerations
The URL can be used to link to this page
Your browser does not support the video tag.