Laserfiche WebLink
Chapter 2 CEQA Findings <br /> <br /> <br />Impact Statement <br /> <br />Evidence/Rationale Supporting Findings <br /> <br />Mitigation Measures <br /> <br />Findings Level of <br />Significance after <br />Mitigation <br /> slope failure due to mainline breaks, and <br /> eliminating over-watering and flooding due to <br /> pipe and/or head breaks. <br /> MM4.13-21 Consideration of installation of <br /> solar roofs on homes and businesses to offset <br /> the increasing demand for energy and natural <br /> gas. <br /> MM4.13-22 Project applicants shall, where <br /> feasible, incorporate passive solar design <br /> features into the buildings, which may include <br /> roof overhangs or canopies that block <br /> summer shade, but that allow winter sun, <br /> from penetrating south facing windows. <br /> MM4.13-23 Use Energy Efficient Roofing <br /> Materials. All roofing materials used in <br /> commercial/retail buildings at the Mixed-Use <br /> Retail Development shall be Energy Star@ <br /> certified. All roof products shall also be <br /> certified to meet American Society for Testing <br /> and Materials (ASTM) high emissivity <br /> requirements. <br /> MM4.13-24 All commercial/industrial projects <br /> shall, where feasible, include up to 10% <br /> renewable energy sources within the project. <br />Impact 4.13-2 Long-term Based on a threshold of 30% reduction in MM4.13-1 through MM4.13-24 would also Finding 1 Significant and <br />cumulative development greenhouse gas emissions over "business apply to this impact. The Agency finds that changes or alterations unavoidable <br />pursuant to the Transit as usual," the Project as a whole had have been required in, or incorporated into, the <br />Zoning Code at full build-out significant impacts for operational project which would avoid or substantially <br />has the potential to conflict emissions due to the size of the Transit lessen the significant environmental effect as <br />with AB 32. The Project as a Zoning Code area. While implementation identified in the final EIR. <br />whole is significant for of mitigation measures MM4.13-1 through Finding 3 <br />operational emissions due to MM4.13-7 would reduce construction- <br />the size of the Transit Zoning related and operational emissions on a The Agency finds that specific economic, <br />Code (SD 84) area. project level basis, in the long-term social, or other considerations make infeasible <br />Transit Zoning Code (SD 84) EIR Findings of Fact/Statement of Overriding Considerations 2-53