My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-023 - Development Agreement Between the Community Redevelopment Agency
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-023 - Development Agreement Between the Community Redevelopment Agency
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 4:16:00 PM
Creation date
5/4/2011 2:08:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-023
Date
4/18/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 2 CEQA Findings <br />Table 2-1 CEQA Findings <br />Level of <br />Significance after <br />Impact Statement Evidence/Rationale Supporting Findings Mitigation Measures Findings Mitigation <br />construction documents, which shall be <br />reviewed by the City of Santa Ana prior to <br />issuance of a grading permit. <br />MM4.2-9 Project applicants shall require by <br />contract specifications that alternative fuel <br />construction equipment (i.e., compressed <br />natural gas, liquid petroleum gas, and <br />unleaded gasoline) be utilized to the extent <br />that the equipment is readily available and <br />cost effective in the South Coast Air Basin. <br />Contract specifications shall be included in <br />project construction documents, which shall <br />be reviewed by the City of Santa Ana prior to <br />issuance of a grading permit. <br />MM4.2-10 Project applicants shall require by <br />contract specifications that construction <br />equipment engines be maintained in good <br />condition and in proper tune per <br />manufacturer’s specification for the duration <br />of construction. Contract specifications shall <br />be included in project construction <br />documents, which shall be reviewed by the <br />City of Santa Ana prior to issuance of a <br />grading permit. <br />MM4.2-11 Project applicants shall require by <br />contract specifications that construction <br />operations rely on the electricity infrastructure <br />surrounding the construction site rather than <br />electrical generators powered by internal <br />combustion engines to the extent feasible. <br />Contract specifications shall be included in <br />project construction documents, which shall <br />be reviewed by the City of Santa Ana prior to <br />issuance of a grading permit. <br />MM4.2-12 As required by South Coast Air <br />2-6 Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding Considerations <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.